• It facilitates better use of project personnel.

    能够更好利用项目人员资源

    youdao

  • The site orientation will address to all project personnel (as well as )the need to segregate waste.

    告知所有项目人员现场方位垃圾分类必要性。

    youdao

  • Manages ship owner, production departments and assigned project personnel to meet project scope of work, budget and schedule.

    管理船东生产部门分配项目人员满足项目工作范围预算时间表

    youdao

  • After the accident happens, the project personnel of the subway dash into the station to rush to repair lifting the apparatus.

    事故发生后地铁工程人员设备冲入车站进行抢修

    youdao

  • After the accident happens, the project personnel of the subway dash into the station to rush to repair lifting the apparatus.

    事故发生后地铁工程人员设备冲入车站进行抢修

    youdao

  • Between July 2006 and February 2007, 9740 newborns were identified, of which 6369 (65%) were vaccinated by project personnel within 72 hours of birth.

    2006年7月2007年2月确认9740名新生儿项目人员其中的6369名(65%)在出生后的72小时内口服了脊髓灰质炎疫苗

    youdao

  • Companies adopt technologies that they believe are best suited to achieving successful systems in production with the available project personnel and budgets.

    公司采用他们认为适合实现成功项的技术,这些技术将确保项目能够在人员和预算的范围内交付成功的系统

    youdao

  • According to operational states of damper, project personnel select 2 each type of dampers and take down site installation locations to make performance test.

    工程项目人员根据阻尼运行工况,每种型号阻尼器任选2台,从现场安装位置拆卸下来性能试验

    youdao

  • In addition, the PMO can be involved in the selection, management, and redeployment, if necessary, of Shared project personnel and, where possible, dedicated project personnel.

    此外必要项目管理办公室也参取对全职或兼职项目团队人员选用、管理调动,如无可尽量选用全职的团队人员。

    youdao

  • Through the separation of the business staff and developer, it causes that the project personnel to do their jobs respectively and enhanced the software development efficiency greatly.

    通过业务人员开发人员分离使得项目人员进其职,从而大大提高了软件开发效率。

    youdao

  • Organize the implementation of the project personnel for construction drawings self-examination, review, construction organization design, construction scheme construction technology solutions.

    组织项目实施人员进行施工图纸自审、会审,施工组织设计、施工方案交底技术解答

    youdao

  • The project would also include the training of personnel in the operation of the container and coal terminals, and computerized management information systems for container operations.

    项目包括人员培训,培训内容集装箱煤炭码头运营以及集装箱业务计算机化管理信息系统

    youdao

  • Can the customer provide the kind of skills and personnel hours that will be needed to support the project?

    客户是否可以提供需要用以支持项目技能人员钟点类型

    youdao

  • Top managers, project sponsors, and clients tend to exert various pressures on middle managers and estimating personnel, usually in the direction of optimistic estimates.

    高级管理人员、项目发起人客户倾向于给中层管理人员和评估人员施加各种压力,这种压力通常乐观评估方向

    youdao

  • GDD embraces a wide variety of scenarios in which the personnel involved in a software or systems development project are extended beyond the traditional setting of a single building or campus.

    GDD包括广泛多样场景其中,与软件系统开发项目有关人员扩展至超越常规单一建筑物校园环境

    youdao

  • Smaller companies are viewed as riskier partners that are vulnerable to the loss of key personnel and "may not have the financial muscle to survive for the duration of a project," the authors said.

    公司容易视作危险合作者,因为他们容易流失核心技术人员,还可能"缺乏足够经济力量在项目的开发周期中生存下来,"这位官员还说。

    youdao

  • The project manager should work with functional managers to reassign personnel to new projects and present team membersplans for future assignments.

    项目经理应该职能经理一起,重新分配人力新的项目中,告诉团队成员未来工作分配的计划

    youdao

  • Furthermore, in accordance with the CMM, she is protected against possible "adverse personnel actions" as she attempts to "escalate deviations outside the project" to the executive level. 7.

    进一步的,CMM一致是,尝试逐步升高项目外部偏差可执行级时,她保护以免于可能的“敌对人员行为”。

    youdao

  • On occasion, a services vendor, such as IBM Business Consulting Services, can be engaged to carry out a proof-of-concept project, and IT personnel participate, learning necessary skills along the way.

    有时候可以要求服务供应商IBMBusinessConsultingServices进行一个概念验证项目IT人员参与其中,以从中学习所必需技能

    youdao

  • As soon as the customer approves the project proposal, assemble the entire project team that have been selected for the solution. The skills and personnel plan should include the following details.

    一旦客户批准项目计划就要集合解决方案挑选整个项目团队

    youdao

  • Team members can be internal (company personnel), external (from project partners, customers, users or temporary personnel) or both.

    项目成员可以内部的(公司员工),外部的(来自项目合作伙伴客户用户或者零时员工)或者两者兼有

    youdao

  • Confirm set pressure with project engineer or boiler plant personnel.

    项目工程师锅炉厂人员确认设置压力

    youdao

  • The SELLER shall determine the number of personnel to be delegated to this Project and shall submit the names and qualifications of their delegation to the BUYER before Contract signing.

    卖方决定代理本项目的人员数量并且签定合同提交他们代表团名单资格买方

    youdao

  • Requirements are defined by the client and these are established during contract review activities and are transmitted to all personnel in the form of project related procedures and specifications.

    合同评审期间客户明确包装、标记运输要求,该要求应项目相关程序和规范规定形式发送所有人员

    youdao

  • Plastic Mountain project successfully completed the factors are: construction materials, site management, technical personnel, technical level, there is the latter part of the maintenance.

    工程成功完成因数施工材料工地管理技术人员技术水平还有就是后期维护

    youdao

  • The proper management of resources can make or break a project operating under a tight financial or personnel budget, while efficient organization promotes resource management.

    基金紧张或者人事匮乏情况是否能对资源恰当的管理可以决定一个项目的成功或者失败

    youdao

  • The proper management of resources can make or break a project operating under a tight financial or personnel budget, while efficient organization promotes resource management.

    基金紧张或者人事匮乏情况是否能对资源恰当的管理可以决定一个项目的成功或者失败

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定