It is the first part of the campus overhaul to the complete, with the final phase of the project is expected to finish in 2019.
它是校园彻底检修的第一部分,最后阶段的项目预计将在2019年完成。
Comprehensive vibration test was conducted on the unit. The main reason of the unstable vibration was analyzed and fault diagnosis project was realized during the overhaul of the unit.
通过对机组振动进行全面测试,分析了故障原因,制定了处理方案。
Comprehensive vibration test was conducted on the unit. The main reason of the unstable vibration was analyzed and fault diagnosis project was realized during the overhaul of the unit.
通过对机组振动进行全面测试,分析了故障原因,制定了处理方案。
应用推荐