These are the theory and specific implementation of optimization the project organization model, scheduling, quality, risk and cost combinatorial controlling.
引入进度、质量、风险、成本联合控制思路以及具体措施和方法。
This model can help you to envision the needs for loading priorities, UMF organization, validation, notification and logging early, thus simplifying the project.
这个模型可以帮助您更早地预见加载优先级、U MF组织、验证、通知与日志记录方面的需求,从而简化项目开发。
If the model requires a relationship to be defined (for example, the Project requires the owning Organization to be selected), you will need to modify the page by hand to add that field to the form.
如果模型需要定义一个关系(例如,Project需要选中所有的Organization),就需要手工修改页面将这个域添加到窗体上。
The model consists of seven levels of maturity and seven dimensions of consideration within an organization or scope defined by the project.
该模型包含在一个组织内或项目范围内应该考虑的7个成熟度级别和7个思考维度。
By applying this model, Golden claims, an organization can more easily identify open source products worthy of further testing in a pilot project and future adoption in the production environment.
作者指出,通过采用这一模型,一个组织能够更容易地识别值得进一步在小型实验中进行测试和未来在生产环境中采用的公开源码产品。
We suggest defining an appropriate standard naming convention for VOBs, components, and streams, as part of a ClearCase usage model for your organization or project.
我们建议为VOBs、组件和流创建合理的标准命名,并作为团队或项目ClearCase使用模型的一部分。
This article introduces the 15th Residential Area of Tama New Town in Japan, focusing on its development ideology, model of project organization and design concept.
本文介绍日本多摩新城第15住区的开发思路、设计组织模式和设计理念。该住区的实例对中国当前的住宅开发具有参考价值。
The maturity model of the project management is a kind of frame and tool, it describes an organization from the confused, unripe course to having a sense of discipline, ripe course.
项目管理成熟度模型是一种框架和工具,它描述了一个组织由混乱、不成熟的过程到有纪律、成熟的过程。
The core of the model is to combine PSP model and CMM, keep PSP and organization process consistent in goal, plan and templates, and achieve the total goal of project process by conducting PSP.
该方案的核心是让PSP模型与CMM模型相融合,使个人软件过程与组织软件过程在目标、计划和操作模板上保持一致,通过个人软件过程的实施,实现项目过程的整体目标;
A qualitative social network model for construction project organization is established, and then this model is quantitatively analyzed with the help of UCINET 6.0.
借助SNA构建了建设项目组织的社会网络模型,运用UCINET a 6.0软件对模型进行了定量分析。
Researches the model of large-complex projects meta-synthesis management, expounds its theorem, organization, key techniques, and brings up normal accident theory in the project.
探索了大型复杂工程综合集成管理模式,对其原理、组织和关键技术进行了阐述,并提出了工程中的正常事故理论。 。
Researches the model of large-complex projects meta-synthesis management, expounds its theorem, organization, key techniques, and brings up normal accident theory in the project.
探索了大型复杂工程综合集成管理模式,对其原理、组织和关键技术进行了阐述,并提出了工程中的正常事故理论。 。
应用推荐