• This chapter developed the concept of breaking down a project into activities in order to draw its graph, or network.

    一章提出工程项目分解若干工作这一概念目的是便于绘制网络

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    论述技术以及项目管理技术,并且根据图论技术项目管理技术设计关键路径算法以及网络图绘制算法。

    youdao

  • This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.

    由于系统网络形式进行工程管理,因此提供一个简单、直观制作网络图的平台。

    youdao

  • Based on algebraic graph theory, an intergrated project of distribution network to identify the distribution network structure, fault locating and reconfigure it.

    根据电工论原理,提出了整套配电网结构辨识故障定位隔离以及故障后重构方案

    youdao

  • Based on algebraic graph theory, an intergrated project of distribution network to identify the distribution network structure, fault locating and reconfigure it.

    根据电工论原理,提出了整套配电网结构辨识故障定位隔离以及故障后重构方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定