• The project method construction management method has been widely used in each construction enterprise units.

    这种项目施工管理已经广泛各个施工企业单位所使用。

    youdao

  • This paper deals with concerns the construction of an icosahedral quasilattice by the cut and project method.

    切割投影研究了二十面体准点阵结构

    youdao

  • The theory of Philosophy, Pedagogics, Psychology, and practice of the project method become base of the emergent curriculum.

    有关哲学教育学心理学理论研究方案教学等实践研究为生成课程奠定丰厚的基础

    youdao

  • The drawback to the setup deployment project method is the time and expense required to build a custom deployment application.

    安装部署专案方法缺点自订部署应用程序所需时间成本

    youdao

  • To some degree, the positivist method of "odd project" is no more than a narrowing-down of the Utopian project method of "odd project".

    某种意义说,波普尔零星工程实证方法只不过一种“零星进步”的乌托邦的工程方法的缩小。

    youdao

  • There are more expositions on the principles and methods of cost control in construction projects, such as value chain analytical method, value project method and ABC taxonomy.

    关于工程施工项目成本控制方法原理,专家和学者论述,仁者见仁智者见智,价值链分析法、量本利分析法、价值工程法、ABC分类法等。

    youdao

  • This paper describes concrete applications in layer object project method of deciding investment of water resources, and illustrates the superiority of this method with a example.

    本文论述了层次目标规划方法水利投资决策中的具体应用配以实便说明此法优越性

    youdao

  • Revenue of long-term project contract shall be reasonably recognized, according to the completed contract method.

    长期工程合同收入已完成合同方式进行合理确认

    youdao

  • In this method, the relationship of risk management and the key project measurements is tenuous.

    方法中,风险管理关键项目测量关系纤细的。

    youdao

  • It is a very simple method for project management and has loose connection to software development.

    项目管理简单方法并且软件开发松弛连接关系

    youdao

  • This is true with any method that is adopted, either at an organizational or project level.

    对于所采用的任何方法不管是组织级还是项目的,情况都如此

    youdao

  • They collected and logged in the most expedient method for the project schedule.

    他们便利方法项目进度收集数据记录

    youdao

  • Choose the correct method for the type of project and the development environment.

    选择适合项目类型开发环境正确方法

    youdao

  • Our team USES the eXtreme Programming (XP) method to develop the project.

    我们这个小组使用极端编程(XP)方法开发这个工程

    youdao

  • In summary, visual modeling is a powerful technique with the potential of adding tremendous value to a method development project when used with caution to avoid being counter-productive.

    总之可视建模一项强大的技术,它能够谨慎用于避免起反作用的时候方法开发项目增添惊人价值

    youdao

  • The project manager needs to be intimately familiar with both lifecycles, which could be achieved by having the project manager and method designer roles performed by the same person.

    项目经理需要同时对生命周期都比较熟悉可以通过一个人来扮演项目经理方法设计人员两个角色实现

    youdao

  • The transition from a waterfall method to an iterative method and phases requires new modes of project organization and understanding.

    瀑布方法迭代方法阶段转变需要项目组织理解模式

    youdao

  • You can use a similar method to deploy a complete project, or part of a project, to a different system.

    可以使用类似方法完整项目或者部分项目部署不同的系统。

    youdao

  • This method enables the project manager and the team to progressively elaborate on the WBS after several meetings and brainstorming sessions.

    这种方法使得项目经理及其团队可以通过若干次会议头脑风暴活动以渐进明细的方式制定WBS

    youdao

  • This section presents the essential work products produced during a method development project.

    这个部分呈现方法开发项目中产生必需工作产品

    youdao

  • Early in the project, it is recommended to outline the method using a method Sketch.

    这个项目前期推荐利用一个方法纲要概述这个方法。

    youdao

  • Finally, managing a method development project is not fundamentally different from managing a software development project.

    最后管理方法开发项目管理一个软件开发项目没有根本不同

    youdao

  • Use the following code listing to build your method, making required changes according to your project.

    使用以下代码清单中的代码,构建方法根据项目来做出需要更改

    youdao

  • Early in the project, the recommended approach is to outline the method using a method sketch.

    项目早期推荐方法利用方法草图概括方法。

    youdao

  • The Project manager can use the Envelope method to maintain the relationship between the agile working team, the non-agile elements of the project and the rest of the enterprise.

    项目经理可以使用信封方法维持三者之间关系:敏捷团队、项目中的敏捷元素、企业中其它因素。

    youdao

  • There is no need to write and test code during a method development project, but there is still a need for testing all links and usage threads.

    方法开发项目没有必要编写测试代码但是仍然需要测试所有连接

    youdao

  • This approach is presented via a roadmap that guides you through the lifecycle of a typical method development project.

    这个方法通过路线图呈现出来,这个路线图可以指导完成一个典型方法开发项目整个生命周期。

    youdao

  • This method makes sure that the project is registered with the XM nature so as to enable XM-specific menus.

    方法确保项目XM性质注册的,以便启用特定于XM菜单

    youdao

  • If the method sketch includes visual models, it may be a good idea in some circumstances to evolve these models into formal project artifacts (e.g., method architecture or method design).

    如果方法草图包含可视模型那么一些情况下这些模型演进正式项目工件(举例来说,方法架构模型设计)可能是个主意

    youdao

  • If the method sketch includes visual models, it may be a good idea in some circumstances to evolve these models into formal project artifacts (e.g., method architecture or method design).

    如果方法草图包含可视模型那么一些情况下这些模型演进正式项目工件(举例来说,方法架构模型设计)可能是个主意

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定