This project started to plan building a new house on the east side of the main house.
这个项目开始规划在主房屋的东侧建造一个新房屋。
This paper introduces the main restoring treatment plan, technical request and construction process after the plumb-line of dam safety monitoring system was broken in Feilaixia Hydro Project.
文中介绍了飞来峡大坝安全监测系统倒垂线断裂后主要的修复处理方案、技术要求和施工过程,为水利工程中类似问题提供参考。
The main aim of our plan was to substantiate the vivid urban character of the project and optimise its functional allocation.
本设计的指导目标,在于使整体设计活泼化、市性格具体化,与功能分配理想化。
The main core backbone once had participated in three large-scale scenic spot above plan design, the project construction.
主要核心骨干都曾参与过三个大型景点以上的规划设计、工程施工。
The main task is to plan the meeting two project demonstration and obtain the relevant departments in support of the leadership.
会议任务主要是两个项目规划方案的论证以及取得相关部门领导的支持。
The plan should be made in the feasibility study stage so that restriction conditions are given by the water and soil conservation plan to the design of main part of the project.
方案的编制应将重点放在开发建设项目的可行性研究阶段,水土保持方案要对主体工程设计提出约束条件。
The site-selection, scale of the project, plan layout, main equipment selection, safety measures, etc. of LPG-car refueling stations in Shanghai are expounded.
从设计角度,就LPG加气站的站址选择与建站规模、站区平面布置、主要设备选型以及安全保障措施等进行了阐述。
The main aim of our plan was to substantiate the vivid urban character of the project and optimise its functional allocation.
本设计的指导目标,在于使整体设计活泼化、都市性格具体化,与功能分配理想化。
He said that in 2010 the main focus of the project should be transferred into the northern part according to the plan of canal new town.
他提出,2010年,要以运河新城规划建设为重点,把运河综保工程重心转移到北面。
Main responsibilities include preparing project plan, arranging logistics, updating website and maintaining accurate data in the system.
工作职责包括准备会议计划、联络会务事宜、发布活动信息、更新网站和会员资料等。
The initial project work: the controlling detailed plan, Environment Influence Assessment and the Geological Disaster Assessment have been completed. The main road has been started to build.
项目前期工作:已完成片区控制性详细规划、环境影响评估、地质灾害评估,开工建设主干道。
The initial project work: the controlling detailed plan, Environment Influence Assessment and the Geological Disaster Assessment have been completed. The main road has been started to build.
项目前期工作:已完成片区控制性详细规划、环境影响评估、地质灾害评估,开工建设主干道。
应用推荐