Copy and Paste Class – This is a bit of a misnomer as it copies all the classes in a specific project item.
复制和粘贴类(Copy and Paste Class)——这或许有些名不副实,因为它可以在一个特定的项目文件中复制所有的类。
On the Service Deployment Configuration page, pay particular attention to the Client project item in the Client-Side Environment Selection section.
在服务部署配置页特别需要注意在客户端环境选择中的Clientproject选项。
Solutions in Visual Studio support a multi-configuration option where project items may be built with a different set of project and project item properties, depending on the selected configuration.
VisualStudio中的解决方案支持多个配置(multi - configuration)选项,其中的项目项可以用不同的项目和项目项属性组来构建,取决于所选的配置。
The Suzhou Creek Comprehensive Rehabilitation project is one important project item in Shanghai City.
苏州河综合整治工程是上海市的一项重大工程项目。
The project item file is saved.
专案项目档案已储存。
Create a project and project item.
创建项目和项目项。
A project item type in the solution.
解决方案中的项目项类型。
Updates the local copy of the project item.
更新项目项的本地副本。
Solution, project, and project item objects.
解决方案、项目和项目项对象。
Updates the remote copy of the project item.
更新项目项的远程副本。
Schema reference for project and project item templates.
专案和专案项目范本的结构描述参考。
Then it evaluates stability combined with a project item.
结合具体工程项目作稳定性分析评价。
Provides a project item with Web site-specific functionality.
为项目项提供网站特定的功能。
The custom tool is run with the project item contents as input.
自定义工具以项目项内容作为输入而运行。
Local Database Cache is available as a new project item template.
“本地数据库缓存”可用作新的项目项模板。
This method loads the project item into a hidden document window.
此方法将项目项加载到隐藏的文档窗口中。
Modify the project item until it is ready to be saved as a template.
修改项目项,直到可以将它另存为一个模板。
Runs custom wizard logic when a project item has finished generating.
当项目项已完成生成时运行自定义向导逻辑。
Adding a project item is one way to extend the functionality of an application.
加入新专案项目是扩充应用程序功能的一种方式。
When you work on the project item, you are working on a separate copy, not the original.
当处理该项目项时,处理的是单独的副本而不是原始文件。
For remote Web sites, this method copies the local copy of the project item to the server.
对于远程网站,此方法会将项目项的本地副本复制到服务器上。
The project item management planning is the programmatic documents guiding project management work.
建设工程项目管理规划是指导项目管理工作的纲领性文件。
The construction principles of the laboratory are that every training item must imitate the practical project item.
实训室建设原则是:每个实训内容全部参照实际工程项目来建设。
You can save a project item that is in a temporary project at any time while you are working with the temporary project.
在使用临时项目的同时,可以随时保存临时项目中的项目项。
In order to create the user interface, the designer may need to be able to instantiate the types described in the project item files.
为了创建用户界面,设计器可能需要具备实例化项目项文件中所描述的类型的能力。
This method can be used to make sure that changes that are made in the local copy of the project item file are reflected on the server.
此方法可用来确保在项目项文件的本地副本中所做的更改在服务器上得到反映。
It is a fast way in structural design of prestressed concrete based on this approach, and it has a vital practical value in project item.
应用该方法能合理、快捷的进行预应力混凝土结构设计,具有重要的工程实践价值。
The metadata within a project item definition, however, refers to a single project metadata element, which can be added, removed, and modified.
不过,专案项目定义内的中继资料是指可以被加入、移除,和修改的单一专案中继资料项目。
The management of petroleum construction enterprise still has many problems at the present, which mainly express in the project item management.
当前,石油施工企业的管理仍然存在很多问题,集中表现在工程施工项目管理上。
A custom tool takes as input the contents of a project item file and generates a new project item file that may or may not be compiled subsequently.
自定义工具以项目项文件的内容作为输入,并生成一个新的项目项文件,随后可能会也可能不会编译该文件。
应用推荐