The traditional project economic evaluation assumes that the project estimator makes the "maximal" decisions in clearly-defined and also explicit conditions.
在传统项目经济评价中,评价主体在详细说明和明确规定的环境下进行效益“最大化”投资决策。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
The relationship between the project planner's decision options and the contribution of the cost estimator in the context of design engineering is discussed.
主要讨论在设计工程的过程中,项目计划人员的决策选择与费用估算人员的贡献之间的关系。
The relationship between the project planner's decision options and the contribution of the cost estimator in the context of design engineering is discussed.
主要讨论在设计工程的过程中,项目计划人员的决策选择与费用估算人员的贡献之间的关系。