In order to flush sediment through, project engineers have designeda series of openings known as sluice gates at the base of the dam.
为了让泥沙和水流一起通过大坝,工程的设计师们在大坝底部设计了一系列的水闸门。
Through this method, the potential additional cost can easily be calculated and compared, which is helpful for project engineers to make a rational decision.
该方法可以方便地计算与比较潜在的附加风险,这有利于项目工程师作出更加理性的决策。
In static loading tests of this project, engineers adopted the self-balance method and solved construction problems successfully.
该工程的静载试验采用了自平衡法,成功解决了工程难题。
In static loading tests of this project, engineers adopted the self-balance method and solved construction problems successfully.
该工程的静载试验采用了自平衡法,成功解决了工程难题。
应用推荐