Administrators also control access to project documents and requirements by assigning document type and requirement type permissions to user groups.
管理员还可以通过给用户组分配文档类型和需求类型权限来控制项目文档和需求的访问。
Project administrators can control the format for saving documents and enable the extended editing function for the project.
项目管理人员可以控制这个版式,从而用来保存文档和激活项目的扩展编辑功能。
Now that you understand how to extract projects and project elements as XML documents, and redeploy them to the server, the steps to build a version control system are fairly easy.
现在您明白了如何提取项目和项目元素作为一个XML文档、并将它们重新部署到服务器上,构建一个版本控制系统的步骤比较简单?
The project manager creates other documents (project documents) in addition to the project management plan to help plan, manage, and control a project.
除了项目管理计划,项目经理也创建其他文档(项目文档)以帮助规划、管理和控制一个项目。
This process addresses and documents the project and deliverable requirements, product requirements, boundaries of the project, methods of acceptance, and high-level scope control.
这一过程处理和记载对项目与可交付成果提出的要求、产品要求、项目的边界、验收方法,以及高层范围控制。
Document Controller of the project will communicate and coordinate with the Document Control Center of contractors and GDLNG on as-built documents handover.
项目文控需与承包商和公司资料文控中心的就竣工资料交接进行沟通和协调。
Supported by a National 863 project, implementing flexible, security and effective model as objective, research on access control for XML documents is conducted in this paper.
本文在国家863项目的支持下,以实现灵活、安全而且高效的模型为目标,对面向XML文档的访问控制进行了全面的研究。
The professional knowledge and qualifications of document control engineer and the tools, methods and work flow of document control are described based upon the characteristics of project documents.
从工程项目文档的特点入手,对文档控制所涉及的相关知识,从业人员要求,采用的工具、方法及工作流程等进行了综合论述。
Support for project management staff providing as-built documents and control related issues.
项目管理人员提供竣工资料文控相关事项的支持。
Wish it can be adopted as project solution or auxiliary documents for some related companies in order to improve domestic self-unloading coaler control system.
希望可以成为某些厂商的设计方案或辅助技术资料,以提高国内自卸船控制技术。
Project units (enterprises) shall apply to Customs for termination with the hold of the relevant papers and documents if the control termination certificate is needed.
项目单位(企业)需要解除监管证明的,可自监管年限届满之日起一年内持有关单证向海关书面申请解除监管。
Project units (enterprises) shall apply to Customs for termination with the hold of the relevant papers and documents if the control termination certificate is needed.
项目单位(企业)需要解除监管证明的,可自监管年限届满之日起一年内持有关单证向海关书面申请解除监管。
应用推荐