MapServer is a server-side mapping solution that can re-project data on the fly.
MapServer是一个可动态再投影数据的服务器端地图解决方案。
This paper focused on the design and implementation of Meridian Project data distribution system.
本论文所讨论的是子午工程数据与通信系统数据分发子系统的设计与实现。
Figure 8: a plethora of materials is used for identification and organizing of process and project data.
图8:用于确认及组织过程和项目数据的过多的材料。
In order for parametric models to have any validity they must be based on or proven using actual project data.
为了参数的模型具备有效性,他们就必须基于或者被证明为是使用精确的项目数据的。
Performance feedback should also be reviewed and project data retained to refine the estimating process, itself.
执行情况反馈也应当被回顾,项目数据被保留,从而重新定义评估的处理过程。
I interview kids who describe how their schools provide a statistician to analyze their science project data.
我面试的孩子们说他们的学校如何为他们的科学项目数据安排一个统计学家来分析。
It is therefore crucial that the outputs coming from test management can be easily combined with other project data.
因此来自测试管理的输出可以很容易地与其他项目数据结合起来是至关重要的。
The real-world project data collected to this point is a snapshot of data from all participating (governed) projects.
收集到此处的真实世界的项目数据是来自所有参与了(受治理的)的项目的数据快照。
If you select Include project data, you need to copy the specified project data structure as part of the new template.
如果选择IncludeProject Data,则需要把指定的项目数据结构作为新模板的一部分拷贝。
These are possible indications, but the decision has to be made according to the project data and business logic needs.
这些只是提示,必须根据项目的数据和业务逻辑需要做出决策。
Complete visibility into your software infrastructure requires both a top-down and bottom-up view of portfolio and project data.
对于软件基础设施平台的完全可见性需要关于组合和项目数据的自顶向下和自底向上的视图。
The influence of the land use and cover change is considered from remote sensing and water and soil conservation project data.
在每个子流域中通过遥测土地利用信息与水保工程资料来考虑了土地利用与覆被变化的影响。
The generate data set dialog allows you to both generate new data sets and include the resulting set data tables in an existing project data set.
生成数据集对话框既允许您生成新的数据集,又支持在现有的项目数据集中包含结果集数据表。
LOE activities will never show a schedule variance. Consequently, the technique always biases the project data toward an on-schedule condition.
成就水平活动不会显示进度偏差,这项技术因此就偏向于那些照计划进行的项目数据。
It describes the relationship between project data with Relational Model. Relational Database supplies storing and manipulating data mechanism.
并且用关系数据库来描述工程数据间的相互关系,实现数据的存储和操作。
These lines are commented out by default. When set with these environment variables, AUTOEXTEND affects all project data files created thereafter.
这些行默认时是注释掉的。当用这些环境变量设置时。
OpenLayers does not have the ability to re-project data itself, so all data included in a map must also be provided in Spherical Mercator projection.
OpenLayers本身并不具备重新投影数据的能力,所以包含在地图内的所有数据必须在Spherical Mercator投影内提供。
It is the sophistication of the data analysis methods and the extensiveness of the underlying project data which determines the effectiveness of a modeling solution.
数据分析方法和大量的潜在项目数据决定一个建模解决方案的效力是一种诡辩的说法。
A few projects contributed project data to OPAL without CCB review and approval. The organization should strengthen the flow management of OPAL review and approval.
少数项目未经CCB审核流程签核,就已将资料回馈入库。组织应加强财富库签核流程管理。
Due to myriad source and complex management for project data, it is helpful to simplify the analysis and design of project management system by research of data model.
项目数据来源多,管理复杂,数据模型的研究有助于简化项目管理系统的分析和设计。
This will ensure that data from a specific project can be easily retrieved and a repository comprising project data can be formed for future reference over a period of time.
这可以确保能方便地获取一个特定项目的数据,并能建立一个包含项目数据的知识库以供将来参考。
In addition to being a centralized location for the project data, this view will be used by the Rational Administrator when setting up the Rational project and test datastores.
此外它还是一个项目数据集中的位置,在创建Rational项目和测试数据存储库时这个视图将被Rational管理员使用。
You can reap the real benefits of lifecycle management tools over time, as you develop a baseline of metrics and other project data, such as architectural blueprints, patterns, and mechanisms.
由于你开发了度量标准和其他一些项目数据,比如构架蓝图、模式和机制,你可以不断地从整个生命周期管理工具中获得实际利益。
Using correlation calculation to further subdivide gray project data, precision of image motion characteristic position information was improved, and sub pixel image motion vector could be gotten.
而通过采用相关计算进一步细分灰度投影数据,可以提高图像运动特征位置信息的精度,获得亚像元级的图像运动矢量。
Using new project data obtained from the process of software development, it can continually predict risks, identify sources of risks, and take proper measure to reduce risk occurrence probability.
随着软件项目的进行,该风险管理模型能够利用不断更新的项目数据持续地预测潜在风险,确定风险源并采取适当的应对措施降低风险发生概率。
Whenever you start a project with someone, you have to establish a clear understanding of expectations for who owns the data, at what point they go public and who can do what with them.
一旦你和其他人开始一项研究,你必须对谁拥有数据、数据何时发表以及谁能如何处理这些数据有一个明确的预期认识。
Whenever you start a project with someone, you have to establish a clear understanding of expectations for who owns the data, at what point they go public and who can do what with them.
一旦你和其他人开始一项研究,你必须对谁拥有数据、数据何时发表以及谁能如何处理这些数据有一个明确的预期认识。
应用推荐