For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.
例如,与项目成本或持续时间无关的度量标准不能帮助评估迭代中的方差削减。
For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.
例如,与项目成本或持续时间无关的度量标准不能帮助评估迭代中的方差削减。
应用推荐