• To evaluate the cost/benefit tradeoff of our approach, which we call PBR-UP, we performed a case study in the context of a small software development project (an object-oriented information system).

    为了评估我们的方法的成本/收益的权衡,我们称其为 PBR-UP,我们在一个小的软件开发项目环境中做了一个案例研究(一个基于对象的信息系统)。

    youdao

  • The cost management by objective is the central part of engineering project management. This paper makes a probe into how to define object cost.

    目标责任成本管理是工程项目管理的中心内容。此文就如何界定目标成本进行了探讨。

    youdao

  • Regarding the cost of engineering project costruction as the object of study, the fisibility of applying ABC in engineering project construction is analyzed.

    并以工程项目施工成本为研究对象,分析工程项目施工引入作业成本法的可行性。

    youdao

  • The construction and installation cost is an important component of a construction project and is also the main object controlled by the whole engineering cost.

    建筑安装工程费用是建设项目的重要组成部分,也是工程造价控制的主要对象。

    youdao

  • In the paper, we take advantage of power grid construction project as the research object, to study the whole process cost management.

    论文以电网建设工程项目为研究对象,对其全过程造价管理进行深入的研究和探讨。

    youdao

  • In the paper, we take advantage of power grid construction project as the research object, to study the whole process cost management.

    论文以电网建设工程项目为研究对象,对其全过程造价管理进行深入的研究和探讨。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定