In this paper, we introduce the conception of project life cycle cost management and basic theory of value engineer.
引入工程项目全生命周期费用管理的概念,介绍了价值工程的基本原理。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
How to play supervision engineer in project cost management role talk about some experience.
就如何发挥监理工程师在工程造价管理的作用谈一些体会。
The KMI mission is to engineer, design and build paint & porcelain enamel finishing systems at a reasonable cost and within the project schedule.
KMI公司策划、设计和生产喷漆和瓷釉表层瓷漆系统,价格合理,保证在项目计划时间内完成。
Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.
[摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理和工程结算成本管理。
It focus on key personnel of project management and engineering classes, such as project managers, technical director, cost engineer, and civil engineers.
流动率高的人才集中在工程管理和工程技术类的关键性人才,如项目经理、技术总监、造价师和土建工程师等。
To be an excellent cost engineer, civil engineers need at least 3 years of practice after graduated from college, and a excellent project manager need special requirements on growth time and line.
从大学毕业到成为一名优秀的造价师、土建工程师至少需要3年的实践经验,而一名优秀的项目经理的成长时间和成长路线更是有着特殊的要求。
More than 5 years' experience in on-site drainage and electricity engineer, familiar with the project budget and settlement, possesses the qualification of above cost engineer ;
从事施工现场水电工程师岗位5年以上,熟悉本专业工程预结算工作,持有造价员以上执行资格;
More than 5 years' experience in on-site drainage and electricity engineer, familiar with the project budget and settlement, possesses the qualification of above cost engineer ;
从事施工现场水电工程师岗位5年以上,熟悉本专业工程预结算工作,持有造价员以上执行资格;
应用推荐