• If your project is in development, late changes to the database schema could trigger significant code changes that jeopardize the timely delivery and quality of the deliverable, thus increasing cost.

    如果项目处于开发阶段,今后更改数据库架构可能会导致巨大代码更改,从而阻碍可交付结果及时交付降低质量,进而增加成本。

    youdao

  • Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.

    根据批准变更控制更新范围费用预算进度质量要求协调整个项目变更。

    youdao

  • The change of project refers the changes of contract caused by the modification of design document or technical specifications, which has great impact on the work of project cost management.

    工程变更是指由于设计文件技术规范修改而引起合同变更对工程造价管理工作较大的影响

    youdao

  • Cost control-controlling changes to the project budget.

    费用控制-控制项目预算变更。

    youdao

  • The implementation of the model indicates that China has a major project cost management system changes.

    模式实施标志我国工程造价管理体制重大变革。

    youdao

  • Provide value engineering input throughout the project and propose changes to the design and construction to reduce cost, enhance quality and shorten the project schedule;

    提供整个项目价值工程投入提出设计施工优化方案降低成本提高质量缩短工期;

    youdao

  • It is inevitable that engineering changes happened in the project of architecture engineering design in the cause of many reasons, and mostly causes low efficiency and high cost.

    建筑工程项目实施过程中,由于存在诸多因素导致工程变更不可避免,并且多数情况产生效率降低和费用增加。

    youdao

  • It is inevitable that engineering changes happened in the project of architecture engineering design in the cause of many reasons, and mostly causes low efficiency and high cost.

    建筑工程项目实施过程中,由于存在诸多因素导致工程变更不可避免,并且多数情况产生效率降低和费用增加。

    youdao