Uncertainty factors of a project construct process which includes randomicity and fuzziness affect the evaluation of project completion time greatly.
项目建设过程中的不确定性因素对预测项目完工时间有较大影响,项目中的不确定性主要是随机性和模糊性。
I work with each staff person to assess project plans and determine time frames, and then we commit to those time frames and I expect completion.
我跟每一个员工评估项目计划并确定时间窗口,然后我们致力于在这些时间窗口内工作,我则期望其完成。
Each time you complete or update an estimate and upon completion of a project, you should document the information that proved pertinent and record lessons learned.
每一次您完成或者升级一个评估和项目的完成,都应当记录那些相关的信息和得到的经验教训。
The village received the first LEED gold certification outside the United States and was the largest LEED-certified project at the time of its completion.
该村获得了LEED在美国之外颁发的第一个金牌认证,并且截止其完工时,是世界上获得LEED认证的最大项目。
Some project managers can be overly analytical and invest too much time in perfecting details, when they should really focus on achieving milestones and the completion of the project.
有些项目经理集中精力实现阶段性目标或完成项目时,太过拘泥细节。
Personal Calendar - keep track of milestones and completion dates, project assignments and time away.
个人日历(Personal Calendar)——跟踪里程碑和完成日期,项目安排和时间。
Upon project completion it is important to review the entire project to determine what could be done better next time.
在项目完成的基础上,检查整个项目来确定下一次哪些应该做得更好是十分重要的。
With the completion of the Three-gorge Project (TGP), the residence time of the water body will be prolonged, and the eutrophication within TGR will be aggravated.
随着三峡工程的全面完工,库区内水体滞留时间的进一步延长,三峡库区水体富营养化趋势将会进一步加剧。
As the time of completion of the Three Gorges Project is drawing near, to have the issue studied is becoming more urgent.
随着三峡工程计划竣工日期的日渐临近,这方面的研究显得愈加迫切。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The project is taking a long time but is now nearing completion.
这个项目耗时很长,但现在就快结束了。
Slack is the amount of time a task can be delayed without delaying the project completion date.
浮动的时间是指没有延误项目完成的任务能够被完成的时间。
After completion of the Three Gorges Project, a long time erosion will occur in the middle and lower reaches of Yangtze river, and the characteristics of river channel will be changed obviously.
三峡水库建成后,长江中下游河道将遭受长河段、长时期冲刷,河床河性会发生很大变化。
This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of project.
此方法可应用于工程项目建设工期定额的修订与完善,以及建设工期定额的执行和建设工期的决策与管理。
If the restored construction project is inspected at the time of completion to be unqualified, and the contractor requests payment of construction costs, such request shall not be sustained.
修复后的建设工程经竣工验收不合格,承包人请求支付工程价款的,不予支持。
The time stamp corresponds to the most recent time that every warehouse adapter job that is scheduled for completion, for every project collection, successfully completed processing.
时间戳记对应于每个专案集合的每个排定要完成之仓储配接器工作成功完成处理的最近时间。
As such, we find it best to keep the release date very loose at this time until the project is close enough to completion that we can accurately predict its ship date.
由于上述原因,我们认为目前最好将发行日期定得宽松些,直到项目接近尾声时,我们会较准确地预测发行时日。
Diligence as measured by completion of most of the problem sets and by presence in the laboratory during final project time.
通过完成大多数作业以及在期末专题期间在实验室的出勤的情况反映出的个人努力。
But the duration has to be increased to 30 years, as a hydro project takes time for completion and functioning.
但由于水电项目需要时间完工和运作,故将持续时间延长至30年。
It will be a long time from the investment decision-making to the completion final accounts of construction project.
众所周知,个建设项目从投资决策到项目建成竣工决算,是一个较长的建设周期。
To improve work efficiency, according to the project time limits for completion of the project activities, the quality and quantity.
要提高工作效率,按照项目时限要求保质保量地完成项目活动。
Modern project management requires lower cost and shorter time and a higher completion rate.
现代项目管理要求成本更低、周期更短、准时完工率更高。
Modern project management requires lower cost and shorter time and a higher completion rate.
现代项目管理要求成本更低、周期更短、准时完工率更高。
应用推荐