• The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.

    建设项目工程变更控制过程工程变更方案技术经济评价建设项目工程变更控制管理重要环节

    youdao

  • You can also change code without having to import the project from your source control system.

    可以源代码控制系统中导入项目的情况下变更代码

    youdao

  • Things can quickly get out of control if anyone associated with the project is able to submit new requirements and/or change requests.

    如果任何项目有关能够提交新的需求/变更需求项目很快地陷入一片混乱并失去控制

    youdao

  • It seems that many PMs who have agile training that is not UP-based do not fully appreciate the need for increased change control rigor as the project progresses.

    看起来许多接受过不是基于UP的敏捷性训练的项目经理并不能够充分地认识对于增长变更控制严格性需要

    youdao

  • Figure 1: Change control rigor increases as the project progresses.

    1随着项目进展变更控制严格性也在不断地加强。

    youdao

  • The project is narrowly scoped to solve the problem of access control to avoid imposing a large and complex change patch on the mainstream kernel.

    这个项目专门用于解决访问控制问题避免主流内核进行大量复杂修改

    youdao

  • I will then cover Struts and how it can control change in your Web project and promote specialization.

    随后讨论Struts说明是如何控制Web项目中的变化提高专业化水平的。

    youdao

  • Addressing the social side of software engineering, Scrum's proven process patterns can offer immediate benefit in requirements management, change control, and project management.

    至于软件工程社会效应方面Scrum被证实的过程模式可以即时地方便需求管理变化控制以及项目管理提供

    youdao

  • Adapting change control rigor during the project.

    适应项目期间变更控制严格性

    youdao

  • After a change to a database is made, the data design project (including all of the resources that it contains) should be checked into version control and tagged or labeled.

    数据库更改后,Optim Database Administrator项目(包括所包含所有资源)应该入到版本控制中,被赋予一个标记标签。

    youdao

  • On the other side, late in the project, you often want to introduce more control, such as change control boards, to remove undesired creativity and associated risk for late introduction of defects.

    一方面,项目后期往往引入更多控制比如变更控制板消除不想要创造性相关风险,以免在晚期引入缺陷。

    youdao

  • This process results in a project management plan that is updated and revised through the Integrated Change Control process.

    过程结果使项目管理计划通过整体变更控制过程得以更新修改

    youdao

  • If you have compiled the project and you get this, the next step is to change the properties of the control.

    如果已经编制项目会得到一点,下一步就是改变控件属性

    youdao

  • Thee project management team uses stakeholders with expert judgment on the change control board to control and approve all requested changes to any aspect of the project.

    项目管理团队利用变更控制委员会具有专家判断利害关系者,控制批准项目各个方面的所有变更请求。 。

    youdao

  • Change control board is established for the project.

    建立项目变更控制委员会

    youdao

  • Project Procurement Management includes the contract management and change control processes required to administer contracts or purchase orders issued by authorized project team members.

    项目采购管理包括合同管理变更控制过程,它们是管理授权的项目团队成员签发合同采购订单所必需的。

    youdao

  • All changes to the project management plan flow through the change management process and integrated change control.

    所有关于项目管理计划变更遵守变更管理流程置于变更控制之下

    youdao

  • Change control is necessary because projects seldom run exactly according to the project management plan.

    由于项目很少准确地按照项目管理计划进行,因而变更控制必不可少

    youdao

  • The project management methodology defines a process that AIDS a project management team in implementing Integrated Change Control for the project.

    项目打点体例系确定了协助项目打点团队实施项目整体变换节制过程

    youdao

  • Finally, to control the whole progress from the BPR project progress tracking, performance evaluation, and the activities change, and ensure to realize the BPR project final goals.

    五是BPR项目进度进度跟踪绩效考核活动变更三个方面进行过程控制确保BPR项目目标实现

    youdao

  • Describes the control interface and connection and interface change technology of TV monitor system, in detail and offers a number of means of realization in project applications.

    详细描述了电视监控系统控制接口连接以及接口转换技术提供了工程中的实现方法

    youdao

  • During the creation of lessons learned for a project, the team determines that the project would have been better if they had a change control board.

    准备项目经验教训时,团队认为如果当初设立变更控制委员会,项目更好一些

    youdao

  • The change control system is a collection of formal documented procedures that define how project deliverables and documentation are controlled, changed, and approved.

    变更控制系统正式形成文件过程的全体,用于确定控制改变批准项目交付成果和文件方式、方法。

    youdao

  • The cost control capacity of the project is vulnerable to the change.

    工程成本控制应变能力差等

    youdao

  • Keeping this scope under control requires a formal procedure for approving any change to the original scope of the project;

    但是,控制这个初始范围需要正式审批流程——任何项目范围的变更都需要审批;

    youdao

  • From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.

    工程变更产生原因出发,分析了工程变更市政工程造价影响,提出了加强市政工程变更有效控制的措施。

    youdao

  • If the control is part of the current solution, when you change from Debug to Release, your project continues to reference the Debug version of the control.

    如果控件当前解决方案一部分则当调试”改为“发布”时,项目继续引用控件的调试版本

    youdao

  • But while change control does need to be a strict process that treats the project baseline as holy, it does not need to be inflexible.

    但是变更控制并不需要严格项目基准神圣不可侵犯的程度,弹性必要的。

    youdao

  • The change control process is meant to protect sacred project baselines while helping to manage key expectations among project stakeholders.

    变更控制流程为了帮助管理干系人的关键期望保证项目基准的严肃性。

    youdao

  • Project teams must treat the baseline as sacred, and only modify it through the change control process as described below.

    项目团队必须严肃对待项目基准,对的任何改动都必须按照后面流程来进行。

    youdao