The mix of activities varies over time as the emphasis and priorities of the project change.
活动的混合会随着项目的重点和优先权的变更而随时变化。
This paper has a deep study of project change and study the standard format and cost issues at the same time.
本论文在深入研究实际项目的洽商变更做法的同时,来研究建筑工程洽商变更的标准化格式及其计价问题。
But, in the project change must have to pass through designs the personnel to authorize, guaranteed cannot damage the product the function.
但是,工程上的更改必须要经过设计人员批准,以保证不会损伤产品的功能。
And combined with the content of this change order, analysis item by item, to solve the problems summarized of second part. (4) the analysis of cost of construction project change.
并结合此工程洽商变更单的内容,逐项分析,解决第二章归纳出来的问题。(4)建筑工程洽商变更计价分析。
As the core component of project change management, software configuration management and software version management, change Information has attracts greater attention than before.
作为项目变更管理、软件配置管理、版本管理处理的核心对象,变更信息正越来越受到人们的关注。
The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.
而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。
From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.
从工程变更产生的原因出发,分析了工程变更对市政工程造价的影响,提出了加强市政工程变更有效控制的措施。
The content of construction project change is so casual, has no standard format, seriously affect the accuracy and timeliness of the construction project change, Increase the difficulty of the audit.
目前建筑工程洽商变更的内容随意性很大,没有标准的格式,严重影响工程洽商变更的工程造价结算得准确性和及时性,增加了审计的难度。
It was a brave decision to change tack in the middle of the project.
在项目进行过程当中改变方针是个大胆的决定。
When you're doing something important, like launching a big project, or running some sort of campaign designed to change things, keep a scrapbook.
当你在做些重要的事情时,例如启动一个大计划,或开展一项以改变为目的的运动,那就做一个剪贴簿。
The life of her family began to change after a targeted poverty relief project was introduced to the village.
在一项精准扶贫项目引入村里后,她的家庭生活开始发生变化。
If you could change something about the project, what would it be?
如果你们能够改变这个项目的一些东西,你们会改变什么?
What I needed was the project management skills to manage change.
我所需要的是能管理变化的项目管理技能。
In this case, you need to change your project name to use the IP address directly.
在这种情况下,您需要改变您的项目名字为直接使用IP地址作为项目名。
And then, as the overall project goals change, the schedule probably is thrown away and never revisited.
然后,随着整体的项目目标的改变,那个进度安排被丢弃并且决不再看。
In a software project, you can change almost anything at any time: plans, people, funding, milestones, requirements, designs, tests.
在一个软件项目中,你几乎可以在任何时间改变任何东西:计划、人、预算里程碑、需求、设计、测试等等。
Resistance to change can kill any project.
拒绝改变会扼杀任何项目。
You must do hiring, training, and then retraining as technologies change, and planning and then replanning as project goals and requirements change.
你必须雇佣、培训、在发生技术变化时重新培训、计划和在项目目标和需求变化时重新计划。
Changing the project structure was a key change.
改变项目结构是非常关键的一步。
Look into the ranks of the program and project managers or the change management consultants to staff the project office.
调查要供职于项目办公室的计划和项目管理人员或更改管理顾问的等级。
It is absolutely imperative that any change to the scope of the project have a matching change in budget, either time or resources.
任何项目范围的改动肯定会不可避免地带来相应预算的改变,无论是时间还是资源。
A project maintainer may change ISPs or host institutions.
项目的维护者可能改变ISP或者存放的机构。
Nothing is persisted on the user's client. This means that when a user modifies something in a project, the change immediately impacts all the users working on the same project.
在客户端没有什么是不变的,这意味着当一个用户在项目中进行修改时,改动会立即影响同一项目中的所有用户。
In a sense, every requirement on a BPI project is also a change request.
在某种意义上,BPI项目中的每一项需求都可以看作是一个变更请求。
Unless you're working on a static project, manually managing change sets is often more trouble than benefit.
除非在一个静态的项目中工作,否则手动管理更改集常常得不偿失。
And because agile project management embraces change and iterative development methods, it requires an efficient tool to make design and communication easy and fast.
同时,由于敏捷项目管理热衷于接受变更以及采纳迭代开发方法,因此需要一个有效的工具以更轻松和快捷地进行设计和交流。
And because agile project management embraces change and iterative development methods, it requires an efficient tool to make design and communication easy and fast.
同时,由于敏捷项目管理热衷于接受变更以及采纳迭代开发方法,因此需要一个有效的工具以更轻松和快捷地进行设计和交流。
应用推荐