• The mix of activities varies over time as the emphasis and priorities of the project change.

    活动混合随着项目重点优先权变更而随时变化

    youdao

  • This paper has a deep study of project change and study the standard format and cost issues at the same time.

    论文深入研究实际项目洽商变更做法的同时,来研究建筑工程洽商变更的标准化格式及其计价问题

    youdao

  • But, in the project change must have to pass through designs the personnel to authorize, guaranteed cannot damage the product the function.

    但是工程更改必须经过设计人员批准以保证不会损伤产品功能

    youdao

  • And combined with the content of this change order, analysis item by item, to solve the problems summarized of second part. (4) the analysis of cost of construction project change.

    结合工程洽商变更内容逐项分析解决第二归纳出来问题。(4)建筑工程洽商变更计价分析。

    youdao

  • As the core component of project change management, software configuration management and software version management, change Information has attracts greater attention than before.

    作为项目变更管理软件配置管理、版本管理处理核心对象,变更信息越来越受到人们的关注。

    youdao

  • The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.

    建设项目工程变更控制过程工程变更方案技术经济评价建设项目工程变更控制管理重要环节

    youdao

  • From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.

    工程变更产生原因出发,分析了工程变更市政工程造价影响,提出了加强市政工程变更有效控制的措施。

    youdao

  • The content of construction project change is so casual, has no standard format, seriously affect the accuracy and timeliness of the construction project change, Increase the difficulty of the audit.

    目前建筑工程洽商变更内容随意性很大没有标准格式严重影响工程洽商变更的工程造价结算得准确性及时性增加审计的难度

    youdao

  • It was a brave decision to change tack in the middle of the project.

    项目进行过程当中改变方针是个大胆决定

    《牛津词典》

  • When you're doing something important, like launching a big project, or running some sort of campaign designed to change things, keep a scrapbook.

    重要事情时,例如启动计划开展一项改变为目的运动,那就做一个剪贴簿。

    youdao

  • The life of her family began to change after a targeted poverty relief project was introduced to the village.

    一项精准扶贫项目引入村里后,她的家庭生活开始发生变化。

    youdao

  • If you could change something about the project, what would it be?

    如果你们能够改变这个项目一些东西,你们改变什么?

    youdao

  • What I needed was the project management skills to manage change.

    所需要管理变化项目管理技能

    youdao

  • In this case, you need to change your project name to use the IP address directly.

    这种情况下需要改变项目名字直接使用IP地址作为项目名。

    youdao

  • And then, as the overall project goals change, the schedule probably is thrown away and never revisited.

    然后随着整体项目目标改变那个进度安排丢弃并且决不再看。

    youdao

  • In a software project, you can change almost anything at any time: plans, people, funding, milestones, requirements, designs, tests.

    一个软件项目中几乎可以任何时间改变任何东西:计划预算里程碑需求设计测试等等

    youdao

  • Resistance to change can kill any project.

    拒绝改变扼杀任何项目

    youdao

  • You must do hiring, training, and then retraining as technologies change, and planning and then replanning as project goals and requirements change.

    必须雇佣培训、在发生技术变化重新培训计划项目目标需求变化时重新计划。

    youdao

  • Changing the project structure was a key change.

    改变项目结构非常关键的一步。

    youdao

  • Look into the ranks of the program and project managers or the change management consultants to staff the project office.

    调查供职于项目办公室计划项目管理人员更改管理顾问等级

    youdao

  • It is absolutely imperative that any change to the scope of the project have a matching change in budget, either time or resources.

    任何项目范围改动肯定会不可避免地带来相应预算改变无论是时间还是资源

    youdao

  • A project maintainer may change ISPs or host institutions.

    项目维护者可能改变ISP或者存放机构

    youdao

  • Nothing is persisted on the user's client. This means that when a user modifies something in a project, the change immediately impacts all the users working on the same project.

    客户端没有什么不变的,意味着一个用户项目进行修改时,改动会立即影响同一项目中的所有用户

    youdao

  • In a sense, every requirement on a BPI project is also a change request.

    某种意义上BPI项目中的需求可以看作一个变更请求。

    youdao

  • Unless you're working on a static project, manually managing change sets is often more trouble than benefit.

    除非一个静态项目中工作,否则手动管理更改常常得不偿失

    youdao

  • And because agile project management embraces change and iterative development methods, it requires an efficient tool to make design and communication easy and fast.

    同时,由于敏捷项目管理热衷于接受变更以及采纳迭代开发方法因此需要一个有效工具更轻松快捷地进行设计交流

    youdao

  • And because agile project management embraces change and iterative development methods, it requires an efficient tool to make design and communication easy and fast.

    同时,由于敏捷项目管理热衷于接受变更以及采纳迭代开发方法因此需要一个有效工具更轻松快捷地进行设计交流

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定