• A new project assessment method, correlation analysis, is applied to assess the project in coal mine design.

    本文利用一种新的方案评判——关联分析法评判矿井设计方案。

    youdao

  • Technical economic assessment method is traditional method used for assessment on energy project, but it has little consideration on environment and energy.

    传统能源项目评价方法主要项目的技术经济评价,环境能源问题很少考虑

    youdao

  • In this essay, the basic concept of rough set is introduced and a model for atmospheric pollution assessment in highway project is built up by means of rough-set comprehensive evaluation method.

    简述了粗糙集理论基础知识,应用粗糙集综合评价法对公路建设项目大气污染进行评价,并通过实例验证了该方法的可行性实用性。

    youdao

  • The index of environment risk assessment system was established based on the properties of chemical engineering project. Fuzzy identification method as well as the case study was studied.

    根据化工建设项目特点建立环境风险评价系统指标体系,研究模糊评判方法应用实例进行分析计算。

    youdao

  • This thesis studies on the assessment method for project risk, and mainly works around the uncertainties of assessment result aroused by the unascertained information in the risk assessment process.

    本文主要项目风险评估方法进行研究围绕风险评估信息(专家意见)对评估结果带来确定性展开工作

    youdao

  • Risk analysis is made for project contracting by the method of process analysis and the technique of risk assessment, considering the present status of ocean engineering.

    运用过程分析方法风险评估技术结合海洋工程项目现状,对项目承包进行风险分析。

    youdao

  • The suddenly changeover multicriterion assessment method is used to evaluate several scenarios of water source engineering in Mid-line of S-N water diversion project.

    应用突变多准则评价南水北调中线水源工程项目方案比选作出评价决策。

    youdao

  • According to the job nature of knowledge management project managers, an assessment method for the quality of venture capital project managers is proposed.

    依据知识管理项目经理工作职责,提出了种知识管理项目经理素质评价方法

    youdao

  • The tradition assessment method often only considered and the income correlation target carries on the weight project decision-making plan the fit and unfit quality.

    传统评价方法往往考虑收益相关指标进行衡量项目决策方案优劣

    youdao

  • Taken coking project as an example, this article elaborates the procedure and method of the environmental risk assessment.

    焦化项目阐述环境风险评价程序方法

    youdao

  • It is shown from a practical example that the reasonable results can be obtained, the method can be used in assessment and design of horizontal drainage project.

    实例表明,该方法合理有效,用于边坡水平水孔幕系统的排水效果评价边坡水平排水孔系统合理设计

    youdao

  • Set up project quality assurance system of evaluation method, to the enterprise comprehensive assessment of the situation of the engineering quality guarantee system.

    建立工程质量保证体系评估考核办法企业工程质量保证体系状况进行综合评估

    youdao

  • Study real estate purpose, content, method and procedure that project assess content of assessment that development item assess.

    研究房地产开发项目评估目的、评估的内容方法项目评估的程序等内容。

    youdao

  • It presents the object, function, content and method of the post-assessment on highway construction project, and discusses the significance.

    介绍公路建设项目后评价目的作用内容方法阐述了公路建设项目后评价的意义。

    youdao

  • Based on the system, the author carries on a quantitative research on the synthetic assessment of risk estimation of geological hazard in the project with grey clustering method.

    基础应用灰色聚类该段地质灾害危险性综合评估进行定量研究

    youdao

  • Based on this method, a system of ambient air impact assessment assuring-probability method concentration forecast is developed and a set of precise, systematical and applied technical project is...

    基础开发环境空气影响评价保证率浓度预测系统”,建立了准确系统实用技术方案

    youdao

  • Post project analysis for environmental impact is a very important method for improving effectiveness of environment impact assessment.

    环境影响评估提高环境影响评价有效性重要手段

    youdao

  • In this paper, the economic assessment method on some technological transformation project of oil pipeline is introduced.

    通过输油管道改造工程经济评价

    youdao

  • Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.

    建立了研发项目多执行模式随机资源约束项目调度问题模型

    youdao

  • Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.

    建立了研发项目多执行模式随机资源约束项目调度问题模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定