The testing tool has such advantages as low investment and good testing efficiency and can be widely applied in SEP project acceptance check and network operation and maintenance.
检测工具的应用部署投入小,快速检测客户端部署状态效果好,可在SEP项目验收、网络运维中广泛应用。
Those who make arbitrary use of a completed construction project which should conduct fire control design in accordance with law but has not passed or fail to pass the fire control acceptance check;
依法应当进行消防设计的建筑工程竣工时未经消防验收或者经验收不合格,擅自使用的;
The passed acceptance check of this pilot project marked the Chinese FM synchronous broadcasting getting into a practical stage.
该试验项目通过验收,标志着我国调频同步广播已走向了实用阶段。
The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.
非煤矿山安全验收评价是矿山建设项目安全验收与审批的主要依据之一。
You can check and accept the translation or project by various means. Our client service system supports various ways of acceptance and delivery.
您可以通过各种方式验收译稿或项目,我们的客服系统支持各种接收和交付方式。
Responsible for the organization of enterprise project engineering, unit engineering division of the check, put forward to the company responsible for the engineering pre-acceptance application.
负责组织项目经理部的分部工程、单位工程的自验,负责向公司工程部提出预验收申请。
Procedures were established in order to improve quality and normalize repetition monitoring for effective promotion of environmental protection acceptance check of construction project.
制定了验收复测程序,旨在规范复测工作,提高复测质量,有效推进建设项目竣工环保验收进度。
This paper states the management programs from three phases of prophase preparation, engineering project construction and project check and acceptance.
为此本文设计了我国商业银行操作风险管理组织结构与管理程序的理想模式。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。