• The testing tool has such advantages as low investment and good testing efficiency and can be widely applied in SEP project acceptance check and network operation and maintenance.

    检测工具应用部署投入,快速检测客户端部署状态效果SEP项目验收网络运维中广泛应用。

    youdao

  • Those who make arbitrary use of a completed construction project which should conduct fire control design in accordance with law but has not passed or fail to pass the fire control acceptance check;

    依法应当进行消防设计建筑工程竣工时未经消防验收或者经验收合格擅自使用的;

    youdao

  • The passed acceptance check of this pilot project marked the Chinese FM synchronous broadcasting getting into a practical stage.

    试验项目通过验收标志我国调频同步广播已走向实用阶段。

    youdao

  • The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.

    煤矿安全验收评价矿山建设项目安全验收审批主要依据之一。

    youdao

  • You can check and accept the translation or project by various means. Our client service system supports various ways of acceptance and delivery.

    可以通过各种方式验收译稿项目我们客服系统支持各种接收交付方式

    youdao

  • Responsible for the organization of enterprise project engineering, unit engineering division of the check, put forward to the company responsible for the engineering pre-acceptance application.

    负责组织项目经理部分部工程单位工程,负责公司工程部提出预验收申请。

    youdao

  • Procedures were established in order to improve quality and normalize repetition monitoring for effective promotion of environmental protection acceptance check of construction project.

    制定验收复测程序,旨在规范复测工作,提高复测质量有效推进建设项目竣工环保验收进度。

    youdao

  • This paper states the management programs from three phases of prophase preparation, engineering project construction and project check and acceptance.

    为此本文设计我国商业银行操作风险管理组织结构管理程序理想模式。

    youdao

  • The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.

    公伯峡水电站引水发电工程具备蓄水条件通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。

    youdao

  • The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.

    公伯峡水电站引水发电工程具备蓄水条件通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定