Unlike on waterfall projects, an overall project estimate is adjusted after each iteration to improve its accuracy.
不像瀑布项目,项目评估在每次迭代中进行调整,不断改善精度。
While test engineers cannot estimate total project cost, they can certainly estimate testing contribution to cost, and suggest test risks and feasibility.
虽然测试工程师不能估算总的项目成本,但是他们的确可以评估对成本的测试贡献,并且提出测试风险和可行性。
People within your organization should also understand that estimates are guidelines within which to deliver projects and that you must occasionally recast the estimate during the project.
组织内的人员还应该了解,评估是交付项目的指南,有时候必须在项目执行期间重新进行评估。
The single most accurate way to estimate velocity on a project is to run several iterations and then see what the average velocity was.
在项目中最精确的估算速度的方法是,进行几个迭代,然后看看平均速度是多少。
This highly customizable document helps you to list and estimate pieces of work very early in the project.
该高度可自定义的文档会帮助您很早就列出和评估项目中的部分工作。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
He also surveyed local suppliers to estimate prices and interviewed villagers to determine the wages paid on the project.
他还在当地供应商中进行调查以估算价格,并采访村民以确定项目支付的工资。
As we mature on the RUP and utilization of the Rational tools, we estimate the amount of project that we can apply the RUP and tools to will continue to increase.
在我们熟练使用RUP和Rational工具后,我们估计使用RUP和工具的项目数量将会增加。
An estimation spreadsheet, to help estimate the amount of effort it could take to create some of the components of your project.
评估电子表格,有助于评估创建项目中某些组件所需的工作量。
Your estimate (in function points) is verified against the International Software Benchmarking Standards Group (ISBSG) repository of actual project results.
您的评估(在功能点方面)将通过实际项目结果的国际软件基准组织(International Soft ware BenchmarkingStandards Group,ISBSG)存储库进行验证。
Table1 shows a sample content inventory summary that was used to help estimate the amount of time it would take to migrate content from a group of Web sites into a portal project.
表1展示了一个内容库存摘要的示例,用来帮助评估将内容从一组Web站点迁移到门户项目要用的时间。
Conclusion ct imaging and cerebral angiography are very important to analyze the state of anterior fossa fracture, design therapy project, estimate prognosis.
结论CT检查及脑血管造影对分析病情、设计治疗方案、判断预后十分重要。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
A project team must believe in their project's goals, estimate, and schedule.
项目组必须相信其项目的目的、估价和时间表。
Project managers tend to claim that they cannot provide an estimate without doing the analysis stage of the project.
项目经理往往声称没有经过项目的分析阶段就无法给出估算。
A 90% complete status estimate on a project that will require years of additional development due to unforeseen complexity is typical.
由于未预见到项目的复杂性,通常会出现这样的情况:经评估完成状态为90%的项目需要数年的时间进行额外的开发。
For example, if productivity is improving as workers and managers become more familiar with the project activities, the estimate of total costs for an item might be revised downward.
例如,如果由于工人和项目经理更加熟习项目工作而使得劳动生产率得以提高,那么项目工作的预测总成本应向下调整。
The project without cost estimate and benefit analysis is often out of control.
未进行成本估算和效益分析就进行软件项目开发,往往会导致项目失控。
Here, we'd like to challenge you to estimate the project, noting your assumptions and results.
这里,我们给你留个课题来估计一下这个项目,记录下你的假设和结果。
Be flexible: Before agreeing to a deadline, estimate how much time this project will eat... And add half that to the result.
富于弹性:在同意一个截止日期之前,估计一下这项目会吃掉多少时间…然后把这个时间增加一半。
The approach does not produce a detailed estimate but it does provide an accurate enough guess to compare projects or to decide whether to start a project.
这个方法并不生成一个详细的估算,但它提供了一个足够精确的推测来比较项目或是决定是否启动一个项目。
This will drive the traditional project estimate higher without increasing the actual difficulty of your project.
这将推动传统项目的估算增高,而又不增加项目的实际难度。
The project manager decides that in order to provide an estimate he will break the project into the following relevant components based on the scope and some critical tasks
项目经理决定,为了给出估算,他要基于项目范围和一些关键任务把项目分解成下列相关的组件
This paper describes the software project cost estimate model based on RUP. Based on the survey, a software project cost management system is designed and realized.
在对基于RUP的软件项目成本估算模型进行研究的基础上,本文设计并实现了基于RUP的软件项目成本管理系统。
Consequently, the detailed estimate is often used as the budget estimate since it is sufficient definitive to reflect the project scope and is available long before the engineer's estimate.
因而,在工程师估算完成前的相当长时间里,只能用详细估算来作为控制预算,因为详细估算也能充分明确地反映项目的范围。
Then, a selected algorithmic method can be configured using actual achieved performance data, and reapplied to improve the project estimate and the project plan.
因此可以用实际的性能数据来选择一种算法评估方法,以改善项目评估结果和项目计划。
Based on the COCOMO model and the current characteristics and situation of project software in aero space area, this paper discusses how to estimate the project software development effort.
基于COCOMO模型并结合中国航天系统型号项目软件开发的特点和现状,讨论了航天型号软件项目开发的成本估计方法。
Prepare project estimate and budget;
编制工程概、预算;
Prepare project estimate and budget;
编制工程概、预算;