• Selecting main operating parameters as decision variables and desired WMD as control goal, polycondensation production process is controlled by sequential quadratic programming (SQP) algorithm.

    选择影响指标主要工艺参数作为决策变量,以产品理想分子量分布目标采用序贯二次规划(SQP)算法对缩聚生产过程进行优化控制

    youdao

  • According to the production line process and production plan, through the TCL programming, achieved interactive simulation and obtained optimized production line.

    根据生产线工艺流程生产计划通过TCL编程实现虚拟生产线交互式仿真获得优化的生产线方案。

    youdao

  • According to the production line process and production plan, through the TCL programming, achieved interactive simulation and obtained optimized production line.

    根据生产线工艺流程生产计划通过TCL编程实现虚拟生产线交互式仿真获得优化的生产线方案。