• The optimum programme can be used to design four-connecting lever pneumatic roof-window mechanism of all kinds of multi-span plastic greenhouses by changing load and structure parameters.

    通过改变载荷参数结构参数,优化模型用于其它塑料温室气动四连杆天窗机构设计

    youdao

  • The article introduces the design principle, heat power load and heat storage, air-conditioning load and ice-storage programme.

    介绍了该项目的设计原则供热负荷热、空调负荷及蓄冰的运行方案

    youdao

  • Through the transformer operation programme and voltage regulation, confirm the operation of each substation under the maximum load or the minimum load.

    通过变压器运行方案设计调压计算,确定各站最大最小负荷下主变压器的运行方式。

    youdao

  • The traditional upgrading way of progressive spot setting programme or changing program chip about load management system needs large manpower, material resources and time.

    负荷管理系统逐户现场固化编程更换程序芯片传统升级方式耗费大量人力、物力时间。

    youdao

  • The traditional upgrading way of progressive spot setting programme or changing program chip about load management system needs large manpower, material resources and time.

    负荷管理系统逐户现场固化编程更换程序芯片传统升级方式耗费大量人力、物力时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定