• 51 for middle and litter batch production scheduling problem.

    生产作业计划的制定在企业中占有重要的地位。

    youdao

  • Production scheduling problem has been shown to be a NP complete problem.

    经证明,生产调度问题是NP完全问题。

    youdao

  • The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.

    建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。

    youdao

  • The batch on-line scheduling problem is presented from the production of iron and steel plant, which is a main part of MES in process industry.

    从钢铁生产热轧流程中提炼出了在同构并行机上的批在线调度问题,它是流程工业中MES的重要环节。

    youdao

  • To solve the problem of resource allocation in the multi-Agent-based agile production scheduling, combinatorial auction based negotiation policy was proposed.

    为了解决基于多智能体的敏捷生产调度中资源分配的协商策略问题,提出了实现组合拍卖的协商策略的解决方法。

    youdao

  • A kind of problem of simultaneously optimizing batch splitting and scheduling for parallel production lines was discussed.

    研究了一类并行生产线上生产调度和批量分割的同时优化问题。

    youdao

  • Applying rough sets theory to production scheduling solves the difficult problem of rules discovery for production scheduling through the successful schedule rules found in history data.

    把变精度粗集应用于生产调度中,在历史调度数据中发现成功的调度规则解决了生产调度中的规则获取难题。

    youdao

  • A new multiqueue method with variable priority is presented to solve the real time dynamic scheduling problem of automatic transportation system in flexible electrophoresis production line.

    提出可变优先级的多重任务队列方法,解决电泳柔性生产线自动输送系统的实时动态调度问题。

    youdao

  • A solution framework is proposed for the problem of synchronized scheduling of production and air transportation in supply chain.

    提出了解决供应链中生产和航空运输协调调度问题的理论框架。

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    将炼钢连铸生产计划中炉机优化匹配问题归结为一个不允许等待的混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

  • The scheduling problem of finite intermediate storage is considered for some unstable materiel in multi-production batch process.

    针对某些不稳定的中间产品,考虑其在中间储罐存储时间有限的调度问题。

    youdao

  • The scheduling problem of finite intermediate storage is considered for some unstable materiel in multi-production batch process.

    针对某些不稳定的中间产品,考虑其在中间储罐存储时间有限的调度问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定