• Production engineering measure planning is different from development planning. It is aimed at optimizing measures workload and selecting candidate wells.

    采油工程措施规划开发规划不同是以优化措施工作量优选候选井为目的。

    youdao

  • Optimizing continuous casting planning is one of the important ways to get high production rate and reduce the energy consuming.

    编制高效的连铸生产计划在提高生产率降低能耗方面具有十分重要的意义。

    youdao

  • Optimizing continuous casting planning is one of the important ways to get high production rate and reduce the energy consuming.

    编制高效的连铸生产计划在提高生产率降低能耗方面具有十分重要的意义。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定