• Creating the Transformer cubes is a simple process that is based on the selected option boxes located in the Reports section.

    Transformercubes创建一个简单流程基于Reports部分中的选项选择情况。

    youdao

  • This matching makes the process of transfer far less wasteful than it is with a traditional transformer-based adaptor.

    比起传统基于变压器制造的适配器,按需电量调节充电法大大降低了不必要的浪费

    youdao

  • The formulation design, processing characteristic and material choice of winding without filling in epoxy resin cast dry-type transformer are introduced. The warnings in cast process are presented.

    介绍了环氧树脂浇注干式变压器填料绕组浇注工艺特点材料选择和配方设计提出了浇注过程注意的事项。

    youdao

  • This method will push the aggregation and calculation operations to the database rather than having Transformer process them.

    这个方法汇总计算操作保存数据库中不是将它交给Transformer处理。

    youdao

  • For example, measure aggregation and calculations can be passed to the database layer for processing rather than having Transformer process them.

    例如度量指标汇总计算可以传递数据库进行处理不是在Transformer中处理。

    youdao

  • Part 9: Add a transformer service to your process.

    第9部分流程中添加转换器服务

    youdao

  • Welding principle and its operating process of flat copper wire in large transformer windings are introduced.

    介绍了大型变压器绕组导线焊接原理及其操作工艺

    youdao

  • In this paper, 10kv distribution transformer selection and installation process is simply discussed.

    本文10KV配电变压器选择安装工艺进行简单论述。

    youdao

  • On basis of LR circuit transition process analysis, the paper describes measuring method of zero time factor for transformer wire-wound resistor with specific exciting supply.

    本文分析LR电路过渡过程基础上,讨论特定激励源实现变压器绕组电阻时间常数测量方法

    youdao

  • A moisture measuring system, including the sensor, can be applied in measuring moisture in pressboard of transformer coils during the drying process.

    由它构成的微水份测量系统可以用于现场干燥过程中的变压器绝缘纸板微水份检测

    youdao

  • The on-site drying method by using hot oil circulation and hot oil spray, its process and the operation result for large transformer are introduced.

    介绍了采用循环热油喷淋法现场干燥大型变压器方法过程运行效果

    youdao

  • The fault reason and treatment process of transformer are introduced in this paper.

    介绍变压器故障原因处理过程

    youdao

  • The wave process of transformer winding under impulse voltage is introduced. The software for winding wave process calculation is presented.

    介绍了变压器冲击电压绕组过程及绕组波过程计算软件

    youdao

  • Based on single column process of packed poromeric chromatographic column, the chromatographic analysis process of transformer oil with SP3430 gas chromatographic apparatus has been improved.

    采用填充多孔高聚物色谱柱单柱流程对SP3430相色谱仪变压器色谱分析流程进行改进。

    youdao

  • This paper analysis reason of bring gas of C2H2 on the purifying process of transformer oil time and time, then brings some methods to treatment.

    针对变压器净化处理过程多次产生乙炔(C2H2),分析原因提出相应防范措施。

    youdao

  • Based on the design process of linear variable differential transformer (LVDT), the expert design system of LVDT is put forward.

    分析差动变压器位移传感器整个设计流程基础上,提出开发位移传感器专家设计系统

    youdao

  • Nameplate rating is only a guide to transformer application, and should only be used as a first step in the selection process.

    铭牌额定值变压器应用一个指导只是选择过程的一步

    youdao

  • In the process of developing submarine cable laying installation for Shengli Oil Field, a certain problem has occurred with overcurrent tripping during switching on of step up transformer.

    胜利油田研制海底电缆铺设装置过程中,发生升压变压器合闸时过电流跳闸问题

    youdao

  • This paper introduces the principle and characteristic of the air-core coil current transformer, designs AC-sampling and processing circuit, and introduces the process of software detail.

    介绍空心线圈电流互感器工作原理特点设计了适于此种互感器交流采样处理电路详细介绍了软件处理过程

    youdao

  • The supply power degree of transformer must be carefully selected in the melting process of electric furnace, so that it is reasonable to supply power.

    电炉冶炼过程慎选变压器供电档位,以达到合理供电目的。

    youdao

  • Transformer economical life is relative and dynamic, and considers all factors which affect transformer economical operation in assessment process.

    经济寿命具有相对性、动态性并且评估过程考虑了影响变压器经济运行方面因素

    youdao

  • In the process level, issues such as communication protocol selection, tripping manner selection, electronic transformer installation are discussed.

    过程,对通信规约选择跳闸方式的选择、电子互感器安装方面的问题进行了讨论。

    youdao

  • To calculate self and mutual inductance of coreless transformer in printed circuit board, The author offered a new method to calculate based on Neumann equation as well as testing process and circuit.

    为了计算印制空芯变压器自感互感提出一个纽曼公式为基础的新的计算方法,并给出了测试方法测试电路

    youdao

  • This article describes some characteristics of ABB transformer and applications in the steel-making process.

    本文主要介绍ABB变压器特点炼钢工艺中的应用

    youdao

  • The Tapping switch damaged of a main transformer which power is 370MVA was analyzed, the handling process the measure of preventing accident were provided.

    一起370MVA变压器分接开关损坏原因进行了分析,介绍处理经过,提出事故技术措施

    youdao

  • The proposed method was verified by a simple model, which has analytical solutions, and used to analyze the pr process of a typical oil-paper insulation structure of converter transformer.

    通过解析双层有损同轴绝缘结构模型验证方法有效性。最后,分析一个换流变压器阀侧绕组典型绝缘结构的极性反转电场变化过程

    youdao

  • Applied transformer in the steelmaking process is a good solution of the implementation of energy efficiency.

    将先进电炉变压器用到炼钢工艺中实现增效节能解决方案

    youdao

  • In common hard switching circuit, high voltage spike usually could be produced during switch transition process because of the effect of transformer leakage inductance and parasitic capacitor.

    常规开关电路中,由于变压器寄生电容影响常常开关转换瞬间产生很高电压尖峰

    youdao

  • In common hard switching circuit, high voltage spike usually could be produced during switch transition process because of the effect of transformer leakage inductance and parasitic capacitor.

    常规开关电路中,由于变压器寄生电容影响常常开关转换瞬间产生很高电压尖峰

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定