Events are required to collect on demand business process measurements that are later used to compute metrics and monitor Key Performance Indicators (KPI).
随需应变业务流程测量需要收集事件,稍后用来计算行量标准和监视Key Performance Indicators (KPI)。
Service Level Agreements (SLAs) are built on top of KPIs, aggregating the process measurements and enabling a triggering action to occur on defined conditions.
服务水平协议(sla)在kpi的基础上构建,聚集流程测量指标并使某个触发操作在指定条件下发生。
The flow measurement accounts for a large share of many process measurements in the industry, such as thermal engineering, chemical engineering and metallurgy.
在热工、化工、冶金等诸多工业过程检测中,流量检测占有很高的份额,也是过程检测的一大难点。
It is well-suited for applications in automatic manufacturing and in-process measurements with the properties of fast response, rugged construction and small size.
它适用于自动化加工过程中的实时测量,具有快速、稳定和小尺寸的特点。
Measurements from a continuous build and automated testing process will give you valuable insight into overall project progress and health.
来自连续的构建和自动化测试过程的度量将会让您对整个项目的过程和全面状况有一个非常好的了解。
The measurements might not be perfectly precise, but the process could allow them to beat the limit of the uncertainty principle.
测量可能不是很精确,但是这个过程能击败不确定性原理的限制。
Simulation results also might help in tweaking the process model to make simulation runs perform closer to the expected performance measurements.
模拟的结果还可以帮助对流程模型进行调整,以使得模拟运行执行的结果与期望的性能测定结果更为接近。
Tracing is the process of delivering measurements from the collector to the core APM system.
跟踪是收集器向核心APM系统交付测量数据的流程。
They used a process called spectroscopy to determine their colors, to see if they were weathered or fresh, and then combined this data with measurements of the NEAs' orbital histories.
他们有光谱分析的方法测定它们的颜色,看它们是饱经风霜的还是新鲜的,然后把这个数据和近地小行星的轨道历史测量数据结合起来分析。
Observation points are the points in a process (tasks, subprocesses, variables, and loops) where measurements are needed to validate the KPI.
观察点是流程(任务、子流程、变量及循环)中的一些位置,在此需要测量以使KPI生效。
But NASA must choose how to process that data when measurements conflict.
但NASA必须选择怎样处理冲突的数据。
Knowing what decisions within the process are critical and understanding what measurements are needed as input to those decisions helps decide where control points are best placed.
了解过程中的哪些决策是关键的,以及这些决策需要哪些度量作为输入,这有助于决定把控制点放在哪里最合适。
And then, the force and scope of the measurements would be regulated dynamically, it reflected the process of continuous evolution and progress.
之后,使用这种措施的力度和范围就发生了动态调整,这反映了不断演进和进步的过程。
Knowing what decisions within the process are critical, and when to make them, and understanding what measurements are needed as input to those decisions, are all part of governance.
知道过程中的什么决策是关键的,以及什么时候制定它们,并且了解需要将什么度量作为那些决策的输入,这些是治理的全部。
Since you did not define details, such as problems, goals and measurements, your process has a fairly low maturity rating.
由于您没有定义诸如问题、目标和度量这类细节,因此您的流程有一个相对比较低的成熟比率。
Subsequent analysis is done on each sub-process of interest to identify the components, services, data inputs and outputs, policies, and measurements.
随后是对感兴趣的各子流程进行分析以确定组件、服务、输入输出数据、策略及测量。
Also, making frequent out-of-process calls might increase garbage collection overhead with a JVM, so look for and consider that factor as well in your measurements.
而且,频繁进行进程外调用可能增加JVM的垃圾回收开销,因此在度量中也应寻找和考虑该因素。
For example, a process in which metal is cut into sheets yields certain measurements, such as each sheet's length, height and weight.
例如,一道将金属切割成片的工艺可以产生一定的测量值,譬如每块金属板的长度、高度和重量。
It's an ongoing process, and scientists are always trying to get more accurate measurements.
这是一个持续的过程,科学家们一直试图做更精确的测量。
High-performance data acquisition is needed in some high speed and high precision measurements when signal measurements, image manipulation and audio frequency signal process are taken.
在信号测量、图像处理、音频信号处理等一些高速、高精度的测量中,都需要进行高性能数据采集。
For later steps in the process particularly where old and new intersect additional measurements must be taken.
随着设计阶段的深入,特别是当原有建筑和新建部分相交接的时候,进一步的测量必不可少。
Measurements and installation control points of fixed large steel formwork are emphasized during construction process.
详细介绍了定型大钢模板施工过程中采取的措施和安装控制要点。
The error introduced by the sampling process caused by making measurements on only a limited portion of a formation.
由于只对地层的有限部分进行测量所导致的采样过程中引入的误差。
The normal plot fusion method needs to calculate weight coefficients from the measurements, and the weight coefficients are constant in data fusion process.
常用的点迹融合算法是基于测量数据统计加权的融合算法,其权系数在整个融合过程中固定不变。
The simultaneous measurements of the magnetic hysteresis loops and thickness-dependent electric conductance were performed in-situ during deposition process.
磁滞循环和依赖于厚度的电导率的同时测量沉积过程中被执行的现场。
Pressure probe automatic calibration and data process system was built for high precision pressure measurements on aero-engine.
压力受感器自动校准及数据处理系统是为航空发动机精确压力测试而建立的。
Primary measurements and analysis of surface reflectance of varied substance along with various machining process are carried out with this system.
利用该测量系统对不同材质、不同加工工艺的物体表面的激光反射分布进行了初步的测量和分析。
Primary measurements and analysis of surface reflectance of varied substance along with various machining process are carried out with this system.
利用该测量系统对不同材质、不同加工工艺的物体表面的激光反射分布进行了初步的测量和分析。
应用推荐