Plan compilation is Introduced by basis of compilation, area of apply, primary material, production technology and design parameter on Pretensioned Spun Concrete Pile.
对《先张法预应力混凝土管桩》图集的编制依据和适用范围、主要材料、生产工艺及有关设计参数作简单介绍。
Primary load of the railway station was transmitted through conversion jacking joist to pile foundation.
地铁上方铁路站房的主要荷载由转换托梁传递至桩基承载。
Making explanation of the design principle of composite pile, and providing the primary data in accordance with the field test of composite pile under the loading of high subgrade in this project.
解释了设计复合桩的原理,针对该工程的高路基荷载下复合桩进行了现场测试,提供了初步的数据。
Pre-stressed pipe pile foundation is used in the gymnasium of certain primary school, in which some pile-heads of them are deviated during the course of constructing.
通过对某小学活动馆的预应力管桩基础在施工过程中出现的桩头偏位的情况进行分析与处理,取得了较好的实用效果并得到了一些有益的经验。
Carpet backing (primary) -the base fabric on which pile yarns are tufted an anchored to make a carpet.
一级地毯底布:在底布上面铺上层层纱线,最后组成簇绒地毯。
The primary goal of this research is to study the influences of different pile-tip soils on the bearing characters of bored piles.
通过模型试验研究不同桩端土对承压钻孔灌注桩承载特性的影响。
The primary goal of this research is to study the influences of different pile-tip soils on the bearing characters of bored piles.
通过模型试验研究不同桩端土对承压钻孔灌注桩承载特性的影响。
应用推荐