• Project pre-feasibility analysis, a crucial part of bridge and tunnel preparatory work construction, often becomes a controlling factor of a project.

    工程预可行性分析是桥梁和隧道建设前期工作的重点组成部分,往往成为项目立项的控制性因素。

    youdao

  • The site selection, prospecting, environmental protection and other preparatory work for the construction of the Nyingchi Airport has been completed, and the project will be launched this year.

    林芝机场的选址、地勘、环保等前期工作已经完成,计划今年正式开工建设。

    youdao

  • Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.

    [摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理和工程结算成本管理。

    youdao

  • Temple in Taipei in February the same year established the Preparatory Office of construction, raising a total of about 5000 base floor construction as the Confucius Temple.

    于同年二月成立台北圣庙建设筹备处,共募集约五千坪作为孔庙的建筑基地。

    youdao

  • Project process management post evaluation mainly includes the preparatory analysis of the project and the post evaluation of construction implement stage;

    项目的过程管理后评价主要包括项目的工程准备分析和建设实施阶段的后评价;

    youdao

  • Give an preparatory solution to how to exert farmers 'main body function in the new rural construction.

    对在新农村建设中农民发挥主体作用的问题作了初步思考。

    youdao

  • And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...

    介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。

    youdao

  • And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...

    介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定