Responsible for unit, module, integration and system testing including preparation of test cases, execution of test plan, verification and reporting of test results.
负责单元、模块、综合系统的测试,包括:开始程序的测试、执行计划的测试、运行结果的更正和报告。
The main structures of the teaching mode can be summed up to organizing preparation, activity experiencing , share- and- exchange , integration-and-application.
其教学模式的主结构可归纳为组织准备、活动体验、感悟归纳、分享交流、整合应用五个环节。
The main structures of the teaching mode can be summed up to organizing preparation, activity experiencing , share- and- exchange , integration-and-application.
其教学模式的主结构可归纳为组织准备、活动体验、感悟归纳、分享交流、整合应用五个环节。
应用推荐