A single machine-scheduling problem with fuzzy delays and mixed precedence relations is discussed.
分析了一类带有模糊时间延迟和混合优先关系的单机调度问题。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
应用推荐