There are precedence constraints between the jobs.
工件之间有一定的优先约束关系。
The objective is to maximize the minimum satisfaction level of fuzzy due dates and mixed precedence constraints.
调度的目的是同时最大化模糊交货期和混合优先约束的最小满意程度。
A problem of scheduling jobs on a single machine subject to fuzzy due dates and mixed precedence constraints is discussed.
讨论了一类模糊交货期和混合优先约束下的单机调度问题。模糊交货期表示对任务完成时间的满意程度;
The problem of scheduling jobs with chain precedence constraints on identical parallel machines is discussed in this article.
所描述的问题为在平行机台上调度具有单一模具约束的成组工作,以实现最小化总拖期量为目标。
This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.
研究具有链式约束的单机随机排序问题,目标函数为加权总完工时间的数学期望。
Features of assembling process are further studied based on it, and an interruptible multiprocessor-sorting model that has precedence constraints and different preparation duration is obtained.
在此基础上进一步研究了零件拼装过程特点,获得了一个具有优先约束关系和不同准备时间的可中断多平行机排序模型。
If configuration affects test identity, then composite should take precedence over that, too. Given those constraints, here's one ordering.
如果配置影响到测试的确认,那么组合也应该优先于配置。
To exert the constraints, the assembly precedence is modeled and the precedence matrix and data file used to describe the precedence constraint are proposed.
提出了装配优先约束关系模型和约束关系模型的优先矩阵表达法与数据文件表达法。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
It is subjected to regular precedence and resource constraints as well as special constraints yielded by flow processes.
它不仅带有常规的时序和资源约束,还带有流水作业所带来的特殊约束。
It is subjected to regular precedence and resource constraints as well as special constraints yielded by flow processes.
它不仅带有常规的时序和资源约束,还带有流水作业所带来的特殊约束。
应用推荐