• It is rather complicated to compute the neutral axis in partially pre-stressed concrete beams after cracking, since we have to solve a cubic equation.

    计算部分预应力混凝土开裂截面应力时,需求中和高度的三次方程,使计算显得比较复杂。

    youdao

  • The pre-stressed profiled steel concrete beams used in Shen'guang Institution of Education and Research Project are characterized by big span, small cross-section and complicated technology.

    深港产学研基地工程采用预应力型钢混凝土具有跨度断面、技术复杂等特点。

    youdao

  • Following the conventional theory of reinforced concrete, analysis the crack distribution of pre-stressed carbon fiber reinforced concrete beams, put forward corresponding formula for calculation.

    沿用传统钢筋混凝土理论,对预应力碳纤维加固裂缝进行分析提出相应计算公式

    youdao

  • That horizontal member of the portal frame consists of two longitudinal pre-stressed concrete box type beams overpassing the big span.

    两个水平构件构成了教室与展区天花板及地板,并在理论教室展示区的配置考量下而设计成不同的高度。

    youdao

  • That horizontal member of the portal frame consists of two longitudinal pre-stressed concrete box type beams overpassing the big span.

    两个水平构件构成了教室与展区天花板及地板,并在理论教室展示区的配置考量下而设计成不同的高度。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定