Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
Considering the special geological condition and the practical situation, we put forward the corresponding comprehensive technical measures of the reinforcement and the treatment on the project.
根据边坡饱和软土特殊的工程地质情况,结合工程实际,提出了相应的加固、处理综合技术措施。
Considering the special geological condition and the practical situation, we put forward the corresponding comprehensive technical measures of the reinforcement and the treatment on the project.
根据边坡饱和软土特殊的工程地质情况,结合工程实际,提出了相应的加固、处理综合技术措施。