The effect c EVA and fillers on bond strength for PP was studied in the hot melt adhesive;
探讨了热熔胶中EVA以及填料对聚丙烯粘接强度的影响;
Delivery date: within 35 days-60 days after the receipt of the original L/C or deposit and the confirmation of pp sample and other details.
交货日期:产前办及有关商品的一切细节确认后、买方收到客商L/C或订金后35天-60天内交货。
Delivery date: within 35 days-60 days after the receipt of the original L/C or deposit and the confirmation of pp sample and other details.
交货日期:产前办及有关商品的一切细节确认后、买方收到客商L/C或订金后35天-60天内交货。
应用推荐