• The transformations of tiny-oil ignition and stable combustion technology were started for meet low load stable combustion on Shaoguan Power Plant Unit 10 "W"-type boiler.

    为了满足韶关电厂10号机组W锅炉负荷,开展了点火稳燃技术改造

    youdao

  • The boiler MFT (master fuel trip) protection was actuated during start up of feed water pump A of Unit 1 and 2 in Huaneng Shantou Power Plant.

    华能汕头发电厂1号2机组发生启动水泵锅炉燃料跳闸MFT事故。

    youdao

  • The reheating turbine and boiler are operated as single unit, so the turbine speed-power control system must be adjusted in accordance with the dynamic characteristic of the whole unit.

    汽轮机已同锅炉组成单元机组运行因此必须根据单元机组整体动态特性来整定汽轮机功频调节系统

    youdao

  • Two controlled circulation boilers were installed in Dagang Power Plant technique updating engineering. Chemical cleaning was achieved before start of the boiler unit.

    大港发电厂技改工程安装台强制循环汽包锅炉机组启动进行化学清洗

    youdao

  • To discover the minor leakage in boiler on time is significant to avoid unscheduled downtime of power unit and minimize maintenance period.

    及早发现锅炉轻微泄漏避免机组非计划停运、缩短检修时间具有非常积极的意义。

    youdao

  • The coal quality and type not only affect the boiler combustion, unit operation, and energy consumption for power generation in power plants, but also has direct relation with the coal handing system.

    煤质的好坏不仅影响锅炉燃烧工况调整机组安全运行电厂发电能耗而且煤质和煤种变化对输系统直接关系

    youdao

  • The operation of load distribution of boiler and turbine as well as the principle for coordinated control for thermal power generation unit with header are expounded.

    论述了母管制热电机组锅炉、汽机负荷分配运算协调控制原理

    youdao

  • Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.

    沙角发电总厂A厂5a空气预热器(以下简称“器”)停炉期间发生燃烧造成空预器严重损坏

    youdao

  • In a steam power plant, after enhancement of process control and administration, medium-loss at boiler unit is obviously reduced; scar-removing ratio is reduced from 6.

    某公司热电厂通过加强过程控制管理降低锅炉站内工质损失,锅炉排污改造前的6

    youdao

  • This article, to the Meng Da power plant 330MW unit, develops one et of complete power station boiler heating surface dust stratification and slag-bonding monitoring system.

    本文针对内蒙达旗电厂330MW机组开发了完整电站锅炉受热面结渣积灰监测系统

    youdao

  • The performance of the boiler-turbine control system has great impact on the safety and economy of a power unit .

    协调系统性能直接影响单元机组运行安全性经济性

    youdao

  • Samples of blended coal ash were taken from the boiler of a power plant 700mw unit. Their softening temperature was measured by a pyramid method on an intelligent ash-melting point measuring device.

    电厂700MW机组锅炉煤灰智能灰熔点测定仪上采用角锥进行软化温度测定

    youdao

  • Water level of boiler drum in power station is one of the main control parameters for turbine-generator unit, which reflects the balance of boiler load and feed-water indirectly.

    电站锅炉汽包水位间接地反映了锅炉负荷给水平衡关系。电站发电机组运行的主要控制参数之一

    youdao

  • Water level of boiler drum in power station is one of the main control parameters for turbine-generator unit, which reflects the balance of boiler load and feed-water indirectly.

    电站锅炉汽包水位间接地反映了锅炉负荷给水平衡关系。电站发电机组运行的主要控制参数之一

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定