An structure analysis in columnar power house of Extension Project of Dahua hydropower station is made by 3d element program and considering three different water levels.
对大化水电站扩建工程的圆筒式厂房,在3种不同水位下,通过三维有限元程序,进行了结构分析,结果表明圆筒结构合理。
This paper explains the role and function of intelligent transformer terminal unit in electric power system, introduces the wain content and design program of the project.
阐述了配电变压器监测终端在配电自动化系统中的作用与功能;介绍了“电力系统配电变压器智能监测终端设备”课题研究的主要内容及设计方案。
In the project of Shuangjiangkou large underground power houses, the program model for joins is used to analyze the ability of houses and to guide the design of engineering.
在双江口大型地下电站厂房项目,计划模式的联接使用的房屋进行分析的能力,并指导工程设计。
Planning selection of sand stocking yard and the aggregate processing program are important parts in the planning and the construction of hydraulics and electric power project.
砂石料场的规划选择和骨料加工方案是水电工程施工组织设计中的重要环节。
The problem can be traced to the nuclear-power program and a highway network project, financed jointly by the state and six private business.
这个问题可以追溯到核电动力计划和公路网工程。这些计划和工程是该州与六家私人企业联合兴办的。
The problem can be traced to the nuclear-power program and a highway network project, financed jointly by the state and six private business.
这个问题可以追溯到核电动力计划和公路网工程。这些计划和工程是该州与六家私人企业联合兴办的。
应用推荐