• Alcan, an aluminium company, is planning to use the heat from one of its smelters to increase the efficiency of its power-generation plant at Lynemouth in Northumberland in Britain.

    铝业企业Alcan,正在计划利用一个精炼厂的热能,从而提高它的位于英国Northumberland的Lynemout h发电厂的效率。

    youdao

  • It can also be well used in power generation expansion planning.

    它同样能够在电源规划中得到很好的应用。

    youdao

  • With gradually increasing proportion of distributed generation (DG) in power sys tem, traditional power system planning faces substantial challenges and new request.

    随着分布式发电(DG)在电力系统中所占比重越来越大,对传统的电力系统规划提出了新的挑战和要求。

    youdao

  • A basic mathematical model for least-cost power generation expansion planning is provided firstly.

    给出了发电扩展规划的基本数学模型。

    youdao

  • A model for the generation expansion planning of power systems based on genetic algorithms (GEP GA) is presented in this paper.

    提出一种基于遗传算法的电力系统电源规划模型。

    youdao

  • This software is applied to generation planning of a certain provincial power network to help the power system planner to make the reliability and economics evaluation of system.

    该软件可用于电网的电源规划工作,为规划人员提供定量的可靠性与经济性分析工具。

    youdao

  • The Government is planning a new generation of nuclear power stations which are due to begin generating power by 2020.

    英国计划开发新一代核电站,这批核电站将从2020年最先发电。

    youdao

  • GAP is a software dedicated to analysis and planning of hydro-thermal power generation systems.

    GAP是一个用于水力发电系统分析和规划的软件。

    youdao

  • The emergence of "new people" and "will power" indicate the planning of the scholars of a new generation who attempt to change the reality and choose the future.

    “新民”、“心力”的出现则代表了一代学人试图改变现实、重新选择未来的实践方略。

    youdao

  • The electric power deregulation has led electric power enterprises very difficult to do integrated resources planning(IRP) because generation, transmission and distribution were to be unbundled.

    在考虑跨区省输电的综合资源规划方法的基础上,研究如何在规划中考虑减排成本,促进排放率低的发电资源更多地参与规划。

    youdao

  • The electric power deregulation has led electric power enterprises very difficult to do integrated resources planning(IRP) because generation, transmission and distribution were to be unbundled.

    在考虑跨区省输电的综合资源规划方法的基础上,研究如何在规划中考虑减排成本,促进排放率低的发电资源更多地参与规划。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定