Every newly built, renovated or expanded coal-fired power generating unit must be equipped with and continuously employ desulphurization equipment.
所有新建、改建、扩建燃煤机组必须同步建成并运行烟气脱硫设施。
In our country, poor weather conditions are important factor in the design of wind power generating unit.
在我国,恶劣的气候条件是风力发电机组设计考虑的重要因素。
Study in the essay is carried out based on online performance monitoring for transient process of coal-fired power generating unit.
为此,本文围绕火电机组动态过程在线性能分析展开研究。
The mathematical model for two-phase flow and heat transfer of wet steam in exhaust pipe for a 600 MW power generating unit with direct air cooling is established.
建立了600MW发电机组直接空冷排汽管道内湿蒸汽两相流动和传热的数学模型。
At the moment the fourth power-generating unit is being built.
此时正在安装第四个发电机组。
The faultiness of demister can not only cause the stop of the FGD system, but also the shutdown of the power-generating unit.
除雾器故障不仅会造成脱硫系统的停运,甚至可能导致整个发电机组停运。
The faultiness of demister can not only cause the stop of the FGD system, but also the shutdown of the power-generating unit.
除雾器故障不仅会造成脱硫系统的停运,甚至可能导致整个发电机组停运。
应用推荐