• Every newly built, renovated or expanded coal-fired power generating unit must be equipped with and continuously employ desulphurization equipment.

    所有新建、改建、扩建燃煤机组必须同步建成并运行烟气脱硫设施。

    youdao

  • In our country, poor weather conditions are important factor in the design of wind power generating unit.

    在我国,恶劣的气候条件是风力发电机组设计考虑的重要因素。

    youdao

  • Study in the essay is carried out based on online performance monitoring for transient process of coal-fired power generating unit.

    为此,本文围绕火电机组动态过程在线性能分析展开研究。

    youdao

  • The mathematical model for two-phase flow and heat transfer of wet steam in exhaust pipe for a 600 MW power generating unit with direct air cooling is established.

    建立了600MW发电机组直接空冷排汽管道内湿蒸汽两相流动和传热的数学模型。

    youdao

  • At the moment the fourth power-generating unit is being built.

    此时正在安装第四个发电机组。

    youdao

  • The faultiness of demister can not only cause the stop of the FGD system, but also the shutdown of the power-generating unit.

    除雾器故障不仅会造成脱硫系统的停运,甚至可能导致整个发电机组停运。

    youdao

  • The faultiness of demister can not only cause the stop of the FGD system, but also the shutdown of the power-generating unit.

    除雾器故障不仅会造成脱硫系统的停运,甚至可能导致整个发电机组停运。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定