• Taking New England 10-unit 39-bus system as the case, the power flow transferring is simulated and simulation results show that the proposed wide area backup protection scheme is effective.

    英格兰10机39节点系统进行潮流转移仿真计算,验证了提出广域后备保护方案的有效性。

    youdao

  • Taking New England 10-unit 39-bus system as the case, the power flow transferring is simulated and simulation results show that the proposed wide area backup protection scheme is effective.

    英格兰10机39节点系统进行潮流转移仿真计算,验证了提出广域后备保护方案的有效性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定