There is a whole area here on the main floor where you can bring a laptop and plug it in for power but on top of that we also have a connection for the internet at every seat.
在主楼层这里有一片很宽敞的区域可供使用笔记本电脑,也可以给电脑充电。并且,我们所提供的网络连接可以覆盖到馆内的每一个座位。
Selecting technology that minimizes floor space, cooling, and power requirements will pay off in the long term and will likely reduce the initial hosting bill.
要选择能够最小化地面空间、制冷和电源消耗的技术方案,这将会使您在长远意义上受益并有可能会减少托管服务的初始费用。
For now, it's just enough to power LED lights in the floor, but in the future, more output is expected from newer technology.
现在,他可以提供地板需要的led灯的需要,在不久的将来,新的技术将产生更多的能量。
Certainly Oscar had a lot of family members to bestow that power on-all the residents of the third floor, in fact.
当然,奥斯卡需要用它的特异功能去关爱的那些家庭成员还有很多——实际上三楼这里的所有住院者都需要它的这种关爱。
The Eubiq tracks he's put into the floor of his restaurant not only solve his power problem, they also allow him to move tables and chairs depending on layout or events.
他将Eubiq接线板嵌入餐厅的地板里,这不但解决了电源问题,而且方便他根据网吧布局和活动安排而移动桌椅。
According to the San Francisco Business Times, three hours of dancing on the special floor would produce 1, 440 watt-hours of power.
据旧金山商业时报报道,在这个特制地板上连续跳舞3小时可以产生144 0瓦特小时的电力。
If their beds were far from the power outlets, they would probably sleep on the floor.
如果他们的床离电源很远,他们很可能会睡到地板上。
A tax on carbon is hardly going to stop the lights going out in a few years, but it would provide a floor price for power, giving investors a clearer sense of likely profits.
在未来几年内碳税几乎不能阻止电灯熄灭,但它将给电力提供一个底价,给投资者一个更清晰的对可能利润的判断力。
Often a raised floor is used so the area under the floor may be used as a large plenum for cooled air and power cabling .
往往是一个活动地板是用来做下的面积地板可作为一个大型的冷却空气中全会和电力电缆。
No power means the toilets stop working, can be a major health risk, heard a report about the slush crossing the floor running down the walls.
没有电力意味着厕所停止运作,这可以是一个重大的健康风险,据称脏水穿过地板在墙上流动。
His case is simple: With no power-sucking life-support systems, ROVs offer more time on the ocean floor-and therefore, more opportunity to explore what we don't know-than manned subs.
他的论点很简单:远程控制潜水器因不需要消耗能量的生命支持系统而能在海底停留更长时间——因此,比载人潜艇有更多机会去探索未知领域。
The total amount of floor-space will add up to around 25 square meters, and they expect to obtain over 1, 400kw per day – more than enough to power their systems.
这种地板的总面积将增加的25平米,预期每天获得1400kw电能。这些电能足够为其系统提供能源。
The placement of electric power lines (extension cords) and hoses on the floor can create a stumbling or tripping hazard.
将电源线(延长线缆)和软管放置在地板上会造成绊倒或摔倒的危险。
Buyers can purchase a wide range of add-ons, including a pool, extra bedrooms, a third-floor addition, a solar power system, in-floor radiant heating and copper roofing.
买家可以购买各种附加设施,包括游泳池,额外的卧室,三楼的额外设施,太阳能发电系统,地板辐射供暖系统和铜屋顶。
Check power tongs and spinning rope are on drill floor.
检查动力钳和尾绳是否在钻台上。
These provide a plenum for air to circulate below the floor, as part of the air conditioning system, as well as providing space for power cabling .
这些提供了全会的空气流通低于楼的一部分,空调系统,以及提供空间,电力电缆。
Based on the theoretical studies on the power flow in the flexible coupling system of machinery and building floor, the power flow transmission spectra are further investigated experimentally.
在对楼层安装机器柔性耦合动力系统功率流理论研究的基础上,本文进一步从实验观点研究了机器—基础柔性隔振系统的功率流传递谱。
If power off or malfunction, the car stops between floors, after restoration of power, the car will move to the nearest floor to obtain better comfort.
由于电源故障引起轿厢在两层之间,当电源恢复轿厢将运行到指定楼层的平层位置。
In this paper the design and analysis of composite floor structure in the boiler workshop which belongs to the 3rd enlargement to Mudanjiang 2nd Electrical Power Plant are presented.
本文介绍了牡丹江第二发电厂三期扩建工程锅炉运转层组合楼盖结构的设计与分析。
This movement should be quicker than the regular squat because it requires the use of muscular power to push off the floor and return to starting position.
这个动作应该比一般的下蹲动作要快,因为它需要使用肌肉的力量来蹬地和回到原来站立处。
Select a location accessible to water lines and power supply where the floor is level.
选择靠近水管和电源的水平地面放置热水器。
Receiver power consumption is determined by dynamic range requirements, controlled by the relationship between the noise floor and the maximum expected signal.
接受器的功耗主要由动态范围的要求确定,由噪底和最大预计信号间的关系确定。
Collapsible Coiler - Rotates on Large Ball Bearings? Power Drive Assembly or Hand Operated? Large Heavy Duty Casters? Floor Lock Brakes? Guide ring? Tool and Tag Tray.
可折叠,绕在大滚珠轴承上?电力驱动或手动?重型大脚轮?地面锁制动器?导向环?工具和配件存储盘。
Power saving technology involves general arrangement, construction buildings and outside walls, doors and windows, sunlight prevention, ventilation and floor.
节能建筑涉及的节能技术:小区布局、建筑单体涉及外墙、门窗、遮阳、通风和屋面。
Power saving technology involves general arrangement, construction buildings and outside walls, doors and windows, sunlight prevention, ventilation and floor.
节能建筑涉及的节能技术:小区布局、建筑单体涉及外墙、门窗、遮阳、通风和屋面。
应用推荐