• The voltage dip of power system is worth notice.

    电力系统的电压骤降问题值得关注。

    youdao

  • A direct method considering transient voltage dip is proposed to calculate the critical clearing time (CCT) ensuring that voltages of post fault power system are higher than limit.

    提出了一种考虑暂态电压跌落限制的直接法,快速求取保证故障后电力系统电压高于限值的故障临界清除时间(CCT)。

    youdao

  • The restriction of transient voltage dip is a constraint on post fault power system.

    暂态电压跌落限制可以考虑为对故障后电力系统的一个约束。

    youdao

  • The second migration power include buoyancy and tectonic activity, which controlled by stratum dip and faulting.

    二次运移的动力包括浮力和构造活动力,其主要影响因素是地层倾角和断裂活动强度。

    youdao

  • Interference (or 'lobing') between the two units causes a dip in power response around this frequency, with a peak above it due to their differences in directivity.

    两个单元间的干扰(凸角)会在该频率周围产生功率响应急降,并由于方向性的差异而产生一个峰值。

    youdao

  • Interference (or 'lobing') between the two units causes a dip in power response around this frequency, with a peak above it due to their differences in directivity.

    两个单元间的干扰(凸角)会在该频率周围产生功率响应急降,并由于方向性的差异而产生一个峰值。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定