The GEF Rapid Assessment Project was prepared and implemented as a part of a MEP Program on Post Wenchuan Earthquake Environmental Safety Assessment and Countermeasures initiated on June 3, 2008.
全球环境基金快速评估项目是作为环境保护部2008年6月3日启动的《汶川特大地震灾后环境安全评估与应对措施》的内容之一进行筹备和实施的。
It presents the object, function, content and method of the post-assessment on highway construction project, and discusses the significance.
介绍公路建设项目后评价的目的、作用、内容和方法,阐述了公路建设项目后评价的意义。
Post project analysis for environmental impact is a very important method for improving effectiveness of environment impact assessment.
环境影响后评估是提高环境影响评价有效性的重要手段。
Domestic wind power project post-assessment has been seriously lagged, it is the urgent need to do wind power construction project post-assessment studies.
国内风电项目后评价工作严重滞后,亟需开展风电建设项目后评价研究。
Water conservancy construction project post-evaluation includes course evaluation, economic evaluation, affection appraising, project goal assessment and constant appraisal.
水利建设项目后评价包括过程评价、经济评价、影响评价、项目目标和可持续性评价。
Water conservancy construction project post-evaluation includes course evaluation, economic evaluation, affection appraising, project goal assessment and constant appraisal.
水利建设项目后评价包括过程评价、经济评价、影响评价、项目目标和可持续性评价。
应用推荐