• The post evaluation work in water saving irrigation project is much late in our country, particularly the systematic research of its theory and method is still in blank.

    我国节水灌溉项目评价工作起步晚,尤其节水灌溉综合后评价理论方法系统研究尚属空白。

    youdao

  • This paper is dedicated to study the ex-post evaluation of power plant construction project to provide new references to that work in our country.

    本文致力于研究电厂建设项目评价我国电厂建设项目的后评价工作提供新的参考

    youdao

  • The second step: job evaluation1, the main job evaluation: (1) status by the nature of the work, first of all enterprises and institutions of the post is divided into several categories;

    第二工作岗位评价1、 工作岗位评价主要步骤:(1)岗位工作性质将企事业单位全部岗位划分成若干个大类;

    youdao

  • The second step: job evaluation1, the main job evaluation: (1) status by the nature of the work, first of all enterprises and institutions of the post is divided into several categories;

    第二工作岗位评价1、 工作岗位评价主要步骤:(1)岗位工作性质将企事业单位全部岗位划分成若干个大类;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定