Increasing the water injection delay time and water injection pressure resulted in slightly decrease of the residual wall thicknesses of post-filled region.
提高注水压力与增加注水延迟时间时注水后填充部分的残留壁厚略有减小。
Increasing the water injection delay time and water injection pressure resulted in slightly decrease of the residual wall thicknesses of post-filled region.
提高注水压力与增加注水延迟时间时注水后填充部分的残留壁厚略有减小。
应用推荐