• Secondly, the author analyses the mechanism that the post-grouting increases the bearing capacity of the bore pile.

    其次分析影响桩基承载力因素出发,后压作用机理进行探讨。

    youdao

  • The pile-end post-grouting technology can increase the bearing capacity of piles and improve the bearing performance of piles.

    后压可以提高承载力改善桩的承载性状。

    youdao

  • The application of post-grouting technique for cast-in-situ pile could not only ensure the construction quality, but also raise the bearing capacity of each pile.

    采用灌注桩后注浆技术既可确保桩基施工质量能提高承载力,极大地发挥桩基承载潜力。

    youdao

  • The post-grouting technique for bored piles can increase the vertical bearing capacity of piles, decrease the subsidence and improve the engineering behaviors of piles.

    钻孔灌注桩后压浆技术提高竖向承载力减少沉降改善桩的工程性状

    youdao

  • Combining with the Hangzhou Liqun Building project, authors introduce some aspects of the pile-bottom post-grouting technology such as features, construction methods and quality control.

    结合杭州利群大厦工程实例,介绍了桩底后压浆技术特点施工工艺质量控制。

    youdao

  • Combined with practical work the construction technology of post-grouting bored pile is introduced and discussed from test pile, construction procedure, pile foundation test and other aspects.

    介绍了后压钻孔灌注桩施工工艺结合工程实例试桩、成工艺桩基检测等方面进行了论述,指出后压浆钻孔灌注桩工艺具有承载力高、工程造价低的特。

    youdao

  • Based on actual projects, it carries out research on the choice of post-grouting method, grouting quantity and bearing capacity of bored pile, and the application of post-grouting in super-long pile.

    结合实际工程,对嵌入卵石层钻孔灌注桩后压设计、施工中后压浆方法选择注浆的确定、后压浆桩的承载力计算、后压浆在超长中的应用等进行研究

    youdao

  • Sometimes, in order to overcome these shortcomings to use bored piles and post-grouting pile, but bored piles are difficult to drilling in sand stratum, drill pipe sticking and dropping often appears;

    有事为了克服以上缺点改用钻孔灌注桩后压灌注桩,灌注桩砂土地层不易钻进,常出现卡钻;

    youdao

  • Based on the application of post grouting technique in the rigid pile composite foundation, the authors investigated the mechanism of the capacity increase of short rigid pile by this technique.

    结合注浆技术刚性复合地基工程中的应用探讨后注浆技术提高刚性承载力作用机理

    youdao

  • Therefore, researches of the subject of post grouting pile group foundation settlement characteristics are conducted for this paper.

    本文针对注浆基础沉降性状这一课题展开相关研究工作。

    youdao

  • The strengthening mechanism, construction technological proceedings and the main points to be noticed in construction with post grouting technique are given.

    介绍了影响泥浆护壁钻孔灌注桩单承载力主要因素,后压浆技术加固机理施工工艺流程施工要点。

    youdao

  • Therefore, it is necessary to conduct the research and study of pile foundation post grouting techniques to reduce the pile foundation settlement and shorten the settlement stability time.

    因此进行桩基注浆技术减小基础沉降以及缩短沉降稳定时间研究非常必要。

    youdao

  • The most interested problems of the design of post base-grouted bored pile are the estimate of the quantity of grouting and the bearing capacity.

    注浆灌注桩单桩合理注浆与承载力计算成为工程界关注的主要问题之一,尚无设计规程可循。

    youdao

  • The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.

    航站楼主体结构采用冲孔设计采用的压浆预应力管桩首次岩溶地区应用

    youdao

  • In the constructing of duct grouting for post-tensioning bonded prestressed concrete, the suitable cement paste is the most essential and important factor to guarantee grouting quality.

    在后张有粘结预应力孔道灌浆施工中,良好性能泥浆保证灌浆质量基本最重要因素

    youdao

  • The post-processing software of GJY grouting automatic recorder was used cooperatively with GJY grouting automatic recorder for collection, analysis and management of all kinds of grouting data.

    灌浆数据采集分析管理系统主要配合GJY系列灌浆自动记录仪使用,用于采集、分析管理各类灌浆施工数据。

    youdao

  • The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...

    航站楼主体结构采用冲孔桩设计采用的预应力管桩首次岩溶地区应用。

    youdao

  • Test results show that composite foundation scheme of the post grouting CFG pile satisfies requirements of design, which proves that this scheme has good economic benefit.

    检测结果表明,该压浆CFG复合地基满足设计要求具有良好经济效益

    youdao

  • The prestressing duct vacuum grouting workmanship is an effective measure for improving the safety and durability of the post-tensioning concrete structures.

    预应力管道真空辅助压浆工艺提高后张预应力混凝土结构安全度耐久性有效措施

    youdao

  • The pile foundation and post grouting for Beijing Fortune Center project was completed by CABR-FE Company.

    北京财富中心桩基施工工程建研地基公司完成

    youdao

  • The mechanism, method, effect and capacity mode of tensile pile with post grouting are introduced.

    介绍了注浆技术的基本原理、实施方法效果分析承载力计算模式

    youdao

  • The post-processing software of GJY grouting automatic recorder was used cooperatively with GJY grouting automatic recorder for collection, analysis and management of all kinds of grouting data.

    GJY灌浆自动记录仪后处理软件主要配合G JY系列灌浆自动记录仪使用用于采集分析管理各类灌浆施工数据

    youdao

  • The tests show that the longer the age of bored piles, the higher the opening pressure of pile end post grouting. However, the age of bored piles has little influence on the final grouting pressure.

    注浆试验表明:随着成龄期增加压力也相应增大,龄期注压力影响不大

    youdao

  • To improve the bearing capacity of piles under Sutong Yangtze River Bridge, different post grouting techniques were adopted to large diameter and super-long piles.

    提高苏通桥桩基础承载力,将不同压浆工艺应用于苏通大桥直径超长桩中

    youdao

  • The empirical formula and calculation parameters can be used in design of post grouting man power mine pile on the same geological type with reference value.

    应用的经验公式及其计算参数可供类型地质人工挖孔设计参考。

    youdao

  • It is also verified that the bearing capacity of post grouting manpower mine pile can be estimated by empirical formula.

    同时验证人工挖孔承载力可以通过经验公式进行估算

    youdao

  • Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.

    灌注桩后压浆技术解决沉淤桩身影响灌注桩承载力问题,使桩底、桩侧土得到了加固,从而大幅度提高灌注桩的承载力,降低了桩的沉降量。

    youdao

  • The post-pressure grouting bored pile is used in the foundation de…

    基础采用底部后钻孔灌注桩体系。

    youdao

  • By analyzing the data of O-cell pile testing, new load transfer models before and after post grouting are proposed.

    通过分析自平衡试桩数据提出了注浆前后荷载传递函数模型

    youdao

  • By analyzing the data of O-cell pile testing, new load transfer models before and after post grouting are proposed.

    通过分析自平衡试桩数据提出了注浆前后荷载传递函数模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定