Plug in power, connect the air source and testing pipe.
插上电源,接上气源,接通检测管。
Confirm to cut down power , and cold before maintain/install and change fixture; confirm to correct installation before plug in power.
维护/安装及更换灯具前,请确认已切断电源,并已冷却;请确认灯具已正确安装方可接通电源。
Confirm to cut down power , and cold before maintain/install and change fixture; confirm to correct installation before plug in power.
维护/安装及更换灯具前,请确认已切断电源,并已冷却;请确认灯具已正确安装方可接通电源。
应用推荐