Taking pressure vessel with crack disfigurement for an example, plastic ultimate load under different load conditions was analyzed.
以舍裂纹缺陷的压力容器结构为例,分析了在不同载荷条件下的塑性极限载荷。
The simplified formula of ultimate tension load is obtained in view of mix plastic-cone tension failure mode of the M10 plastic embedded part.
针对M 10型预埋件的塑胶-锥体复合拉伸破坏形态,得出极限拉伸荷载的简化计算公式。
According to the ultimate bearing capacity control method, the effective length of a cement-mixed pile is calculated with the linear elastic-plastic load transfer function.
采用线弹塑性荷载传递函数,按极限承载力控制法确定水泥搅拌桩的有效桩长。
The negative plastic hinge line in the plate was evaluated by using variational approach, then an equation for calculating the ultimate load carrying capacity was developed.
首先利用变分原理确定板的负塑性铰线方程,继而推导出极限承载力的表达式。
And based on this way, the elastic-plastic ultimate bearing-load capacity of Dongjiang Bridge in largest cantilever stage and finished stage were assessed.
并依此方法对东江大桥最大悬臂阶段及成桥阶段的弹塑性极限承载力进行了评估。
And based on this way, the elastic-plastic ultimate bearing-load capacity of Dongjiang Bridge in largest cantilever stage and finished stage were assessed.
并依此方法对东江大桥最大悬臂阶段及成桥阶段的弹塑性极限承载力进行了评估。
应用推荐