• The assessment of diffuse earthquake is a key point in nuclear power plant siting.

    弥散地震评价核工程选址地震安全性评价重要内容之一。

    youdao

  • The segmentation of seismo-active fault has become one of the basic methods in the nuclear power plant siting and the seismic risk analysis.

    地震活动断层分段核电工程选址及其地震危险性评价中具有重要意义。

    youdao

  • On the basis of the above discussions, proposals for volcanic investigation and evaluation methods in the nuclear power plant siting is put forward.

    上述讨论基础上提出了核电厂选址工作有关火山调查评价方法建议

    youdao

  • Design Basis Flood Level is one of the important parameters in nuclear power plant siting in coastal area, and evaluation for storm surge is the main factor of Design Basis Flood Level.

    设计基准洪水位滨海核电厂选址中的重要参数之一风暴潮评价又是设计基准洪水位的主要组成因素

    youdao

  • Siting of a sludge treatment system at a power plant, where high-pressure steam generated by the SCWO process could be fed into a steam header, would provide greater economic benefit.

    选择把污泥处理系统坐落发电厂内,超临界水氧化装置生产高压蒸汽融入发电厂内现有的高压蒸汽总管这样可以发电厂带来经济效益

    youdao

  • The capable fault is a very important concept during the siting of a nuclear power plant.

    核动力工程选址能动断层一个十分重要概念

    youdao

  • This paper briefly describes the siting of Qingshan Nuclear Power Plant, the first 300MW PWR unit of China.

    本文简要介绍了我国第一座300MW压水堆核电站——秦山核电厂厂址选定情况。

    youdao

  • This paper briefly describes the siting of Qingshan Nuclear Power Plant, the first 300MW PWR unit of China.

    本文简要介绍了我国第一座300MW压水堆核电站——秦山核电厂厂址选定情况。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定