If there is any component failure or problem, it will cause the equipment to be shut down, and the planned shutdown will bring the loss.
如果平台任何部件出现故障或问题,那么必将导致设备停工,而计划外的任何设备停工都会带来损失。
The oil reservoir shall act as a barrier to trap moisture and provide sufficient time for a planned shutdown in the event of an outer seal failure.
油箱应该在外部密封失效、设备关闭的一段时间内具有防潮屏障的功能。
Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.
故障转移是主系统在计划内或计划外的关闭,并包括完成将备用节点置于在线以接管处理负载的任务。
Restarting may be needed after a planned shutdown, after an unplanned machine failure, or in order to replay a model event of scientific interest with a different time step granularity.
重新启动可能需要在计划关机之后,计划外机器故障之后,或者在使用不同时间步骤粒度重放科学模型事件时。
The 10-year-old NMCI is scheduled for shutdown on Sept. 30, with all services planned for migration to NGEN, the Navy's next-generation network.
运行10年的海军陆战队内部网将于9月30日关闭,所有服务将迁移到海军下一代网络NGEN。
The 10-year-old NMCI is scheduled for shutdown on Sept. 30, with all services planned for migration to NGEN, the Navy's next-generation network.
运行10年的海军陆战队内部网将于9月30日关闭,所有服务将迁移到海军下一代网络NGEN。
应用推荐